TotalEnergies - Peguerinos

Av. Madrid, 1, Navas del Marqués, Las (05239), Ávila, Spain
Network OperatorTotalEnergies Charging Services España, SLU
Total Capacity3 bays (3 plugs)
GPS Coordinates40.62640, -4.23363
Official IDRD21WGXGLSYEEX5U5Q8J
Official Registry DateFeb 18, 2026

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Navas del Marqués, Las, belonging to the province of Ávila (Castilla y León, Spain). The charging equipment and commercial operation belong to the TotalEnergies Charging Services España, SLU network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
CCS Combo 2
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:125 A
2Charging Bay #2
1 connector available
CHAdeMO
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:125 A
3Charging Bay #3
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:230 V
Amperage:32 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO CodeRD21WGXGLSYEEX5U5Q8J
Post / EVSE Identifier #1YAM3NAK5UFZLNYIIAMTJ6YDKTX8
Post / EVSE Identifier #2ES*TCB*E000676
Post / EVSE Identifier #31
Post / EVSE Identifier #4SAAMDDHJJFLHWPNRD8PYEZJEOF7
Post / EVSE Identifier #5ES*TCB*E000677
Post / EVSE Identifier #6YPSQBRWVMME9KZROAE8Y6R7I4VM
Post / EVSE Identifier #7ES*TCB*E000678

Theoretical Charging Times at Maximum Power (50 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~24 min(~0.4 hours)
40 kWh Battery~48 min(~0.8 hours)
60 kWh Battery~1 h 12 min(~1.2 hours)
80 kWh Battery~1 h 36 min(~1.6 hours)

Opening Hours

Public hours not specified

Supported Payment Methods

💳RFID Card / Keyfob reader
✓PAGO CON TARJETA DE CRÉDITO
📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 40.6264 | Lon: -4.233633View on OpenStreetMap →

Other Nearby Charging Stations

22 kW(Semi-fast)
9.1 km away

AhorraMas El Escorial

Calle Buenaventura Madrigal 4
Operator:EDP CLIENTES SAU
Tipo 2 (Mennekes)
1 point • 2 plugs
Details
7.36 kW(Standard)
12.9 km away

E-SG-ElEspinar-002

Garganta,40
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.