150 kW• Ultra-fast🏨Hotel / AlojamientoActive in MITECO registry

TotalEnergies - Hotel Tancat de Codorniu

Partida Las Mallad, 54, Alcanar (43530), Tarragona, Spain
Network OperatorTotalEnergies Charging Services España, SLU
Total Capacity2 bays (2 plugs)
GPS Coordinates40.52890, 0.50923
Official IDC0JFMZLUIOFSBME2IKE3
Official Registry DateFeb 18, 2026

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Alcanar, belonging to the province of Tarragona (Cataluña, Spain). The charging equipment and commercial operation belong to the TotalEnergies Charging Services España, SLU network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
CCS Combo 2
150 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:375 A
2Charging Bay #2
1 connector available
CCS Combo 2
150 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:250 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO CodeC0JFMZLUIOFSBME2IKE3
Post / EVSE Identifier #1GTSJU2RNBYAGTYHHN6FY59TAWIP
Post / EVSE Identifier #2ES*TCB*E001087
Post / EVSE Identifier #31
Post / EVSE Identifier #4DT16MBMYIMQWJS9YQSKPV97HQ7O
Post / EVSE Identifier #5ES*TCB*E001088

Theoretical Charging Times at Maximum Power (150 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~8 min(~0.1 hours)
40 kWh Battery~16 min(~0.3 hours)
60 kWh Battery~24 min(~0.4 hours)
80 kWh Battery~32 min(~0.5 hours)

Opening Hours

Public hours not specified

Supported Payment Methods

✓PAGO CON TARJETA DE CRÉDITO
💳RFID Card / Keyfob reader
📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 40.5289 | Lon: 0.509226View on OpenStreetMap →

Other Nearby Charging Stations

22 kW(Semi-fast)
6.0 km away

E-CS-Vinaros-001

Viejo De Rosell,2
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
6 points • 6 plugs
Details
60 kW(Fast)🛒Supermercado Consum
7.3 km away

Supermercado Consum Vinaròs

Carrer De La Mare De Déu Del Pilar, S/N, 12500 Vinaròs, Castelló
Operator:ERANOVUM E-MOBILITY, S.L.
Tipo 2 (Mennekes)CCS Combo 2
2 points • 3 plugs
Details
22 kW(Semi-fast)
9.4 km away

CS-VINAROS-005

Dels Artesans,6
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
4 points • 4 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.