100 kW• Fast🏨Hotel / AlojamientoActive in MITECO registry

TotalEnergies - Hostal Torremar

Ctra. N-Ii, Km. 154, Medinaceli (42248), Soria, Spain
Network OperatorTotalEnergies Charging Services España, SLU
Total Capacity6 bays (6 plugs)
GPS Coordinates41.18932, -2.40146
Official IDASP8ZASNNQEFTCB0N5V6
Official Registry DateFeb 18, 2026

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Medinaceli, belonging to the province of Soria (Castilla y León, Spain). The charging equipment and commercial operation belong to the TotalEnergies Charging Services España, SLU network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
CCS Combo 2
100 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:500 V
Amperage:200 A
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:230 V
Amperage:32 A
3Charging Bay #3
1 connector available
CCS Combo 2
100 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:500 V
Amperage:200 A
4Charging Bay #4
1 connector available
CCS Combo 2
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:125 A
5Charging Bay #5
1 connector available
CHAdeMO
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:125 A
6Charging Bay #6
1 connector available
Tipo 2 (Mennekes)
11 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:230 V
Amperage:63 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO CodeASP8ZASNNQEFTCB0N5V6
Post / EVSE Identifier #1B3PZZ3ZTMMEMRS5ECNCIMDML4UZ
Post / EVSE Identifier #2ES*TCB*E000970
Post / EVSE Identifier #31
Post / EVSE Identifier #4QOWTDTE0VBPUKIECAFVSYRKARR7
Post / EVSE Identifier #5ES*TCB*E000971
Post / EVSE Identifier #6ZYW8RSPKUTOIWM27QP3BGSYBQYA
Post / EVSE Identifier #7ES*TCB*E000972
Post / EVSE Identifier #8MITCZUNMT2DDLRHBWHYUKATHOY9
Post / EVSE Identifier #9ES*TCB*E000973
Post / EVSE Identifier #10TEKQZQ6V9IPJASM3UVZY7IB4KT2
Post / EVSE Identifier #11ES*TCB*E000974
Post / EVSE Identifier #128PMIXE5NQBVZVO61TRIF85NM1I3
Post / EVSE Identifier #13ES*TCB*E000975

Theoretical Charging Times at Maximum Power (100 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~12 min(~0.2 hours)
40 kWh Battery~24 min(~0.4 hours)
60 kWh Battery~36 min(~0.6 hours)
80 kWh Battery~48 min(~0.8 hours)

Opening Hours

Public hours not specified

Supported Payment Methods

✓PAGO CON TARJETA DE CRÉDITO
💳RFID Card / Keyfob reader
📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 41.189316 | Lon: -2.401461View on OpenStreetMap →

Other Nearby Charging Stations

50 kW(Fast)⛽Estación Repsol
240 m away

Repsol ES, Villahuerta S.L

At A-2 P.K. 154,4 I
Operator:REPSOL SOLUCIONES ENERGÉTICAS SA
Tipo 2 (Mennekes)CCS Combo 2CHAdeMO
1 point • 3 plugs
Details
180 kW(Ultra-fast)🏨Hotel / Alojamiento
20.5 km away

TotalEnergies - Hostal El Cercao

C. De D. Juan Manuel Pardo Gayoso, 2
Operator:TotalEnergies Charging Services España, SLU
CCS Combo 2Tipo 2 (Mennekes)CHAdeMO
4 points • 4 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.