175 kW• Ultra-fastActive in MITECO registry

TotalEnergies - E.S. El Berrocal

Autovia Del Suroeste, Km182, Navalmoral de la Mata (10300), Cáceres, Spain
Network OperatorTotalEnergies Charging Services España, SLU
Total Capacity8 bays (8 plugs)
GPS Coordinates39.87353, -5.54984
Official ID7U7X0V78ZMI7AVZMFGIK
Official Registry DateFeb 18, 2026

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Navalmoral de la Mata, belonging to the province of Cáceres (Extremadura, Spain). The charging equipment and commercial operation belong to the TotalEnergies Charging Services España, SLU network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
CCS Combo 2
175 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:700 V
Amperage:250 A
2Charging Bay #2
1 connector available
CHAdeMO
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:125 A
3Charging Bay #3
1 connector available
CCS Combo 2
175 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:700 V
Amperage:250 A
4Charging Bay #4
1 connector available
CHAdeMO
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:125 A
5Charging Bay #5
1 connector available
CCS Combo 2
175 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:700 V
Amperage:250 A
6Charging Bay #6
1 connector available
CHAdeMO
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:125 A
7Charging Bay #7
1 connector available
CCS Combo 2
175 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:700 V
Amperage:250 A
8Charging Bay #8
1 connector available
CHAdeMO
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:125 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code7U7X0V78ZMI7AVZMFGIK
Post / EVSE Identifier #1A8RTY5EYUIKDMIVFIIFREHTKCGQ
Post / EVSE Identifier #2ES*TCB*E000400
Post / EVSE Identifier #31
Post / EVSE Identifier #4OF0QCN2X1PUXLI8KRLMVBSFOWVS
Post / EVSE Identifier #5ES*TCB*E000401
Post / EVSE Identifier #666CLKOK8WXTGHYK2PETEHZOILRC
Post / EVSE Identifier #7ES*TCB*E000402
Post / EVSE Identifier #8ZXPR7IYTXUUSXGYZ0Z7C9TDV2BN
Post / EVSE Identifier #9ES*TCB*E000403
Post / EVSE Identifier #10PKUFPIJRGVI705XNELT6DASD4XT
Post / EVSE Identifier #11ES*TCB*E000404
Post / EVSE Identifier #12LP6VEN1E0S9PROSVWNNMS3ND0I0
Post / EVSE Identifier #13ES*TCB*E000405
Post / EVSE Identifier #14WYF5J05WQNZ21XGN2HULPRWBCLS
Post / EVSE Identifier #15ES*TCB*E000406
Post / EVSE Identifier #16RVF3BRZQGJ8ZFBDI1VV5WMO15LD
Post / EVSE Identifier #17ES*TCB*E000407

Theoretical Charging Times at Maximum Power (175 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~7 min(~0.1 hours)
40 kWh Battery~14 min(~0.2 hours)
60 kWh Battery~21 min(~0.3 hours)
80 kWh Battery~27 min(~0.5 hours)

Opening Hours

Public hours not specified

Supported Payment Methods

💳RFID Card / Keyfob reader
✓PAGO CON TARJETA DE CRÉDITO
📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 39.87353 | Lon: -5.54984View on OpenStreetMap →

Other Nearby Charging Stations

175 kW(Ultra-fast)
10 m away

E.S. El Berrocal

Autovía A-5, Km 182
Operator:Wenea Services Spain, S.L.
CHAdeMOCCS Combo 2
8 points • 8 plugs
Details
50 kW(Fast)⛽Estación Repsol
2.6 km away

Repsol ES, CRED Navalmoral

Cr N-5A, 180,8
Operator:REPSOL SOLUCIONES ENERGÉTICAS SA
Tipo 2 (Mennekes)CCS Combo 2CHAdeMO
1 point • 3 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.