50 kW• Fast24/7Active in MITECO registry

TO-Toledo-007

Rio Jarama,4, Toledo (45007), Toledo, Spain
Network OperatorIBERDROLA CLIENTES S.A.U
Total Capacity2 bays (3 plugs)
GPS Coordinates39.86471, -3.96973
Official ID2024000346
Official Registry DateApr 07, 2025

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Toledo, belonging to the province of Toledo (Castilla - La Mancha, Spain). The charging equipment and commercial operation belong to the IBERDROLA CLIENTES S.A.U network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
CCS Combo 2
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:500 V
Amperage:125 A
2Charging Bay #2
2 connectors available
CHAdeMO
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:500 V
Amperage:125 A
CCS Combo 2
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:500 V
Amperage:125 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2024000346
Post / EVSE Identifier #1COD20240000018297PR00001012
Post / EVSE Identifier #2ES*IBD*E157174
Post / EVSE Identifier #3166673
Post / EVSE Identifier #4COD20240000018296PR00001011
Post / EVSE Identifier #5ES*IBD*E157173
Post / EVSE Identifier #6166672
Post / EVSE Identifier #7166671

Theoretical Charging Times at Maximum Power (50 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~24 min(~0.4 hours)
40 kWh Battery~48 min(~0.8 hours)
60 kWh Battery~1 h 12 min(~1.2 hours)
80 kWh Battery~1 h 36 min(~1.6 hours)

Opening Hours

24/7

Supported Payment Methods

💳RFID Card / Keyfob reader
✓PAGO CON TARJETA DE CRÉDITO
✓PAGO CON TARJETA DE DÉBITO
📱Mobile App (Remote activation & eMSP roaming)
📅Advance slot reservation supported

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 39.864709 | Lon: -3.969728View on OpenStreetMap →

Other Nearby Charging Stations

250 kW(Ultra-fast)
410 m away

Toledo, Spain

Av. Del Río Boladiez
Operator:Tesla Spain SLU
CCS Combo 2
8 points • 8 plugs
Details
60 kW(Fast)
1.0 km away

US_55_Toledo_II

Calle Río Jarama
Operator:PLENOIL, S.L.
Tipo 2 (Mennekes)
1 point • 1 plug
Details
11 kW(Semi-fast)
1.1 km away

NUEVO HOSPITAL DE TOLEDO

AVENIDA DEL RIO GUADIANA, SN
Operator:REMO SUSTAINABLE MOBILITY S.L
Tipo 2 (Mennekes)
34 points • 34 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.