22 kW• Semi-fast24/7Active in MITECO registry

Telpark - El Violon

Pº Del Violón 5, Granada (18006), Granada, Spain
Network OperatorMAKSU ESPAÑA SL
Total Capacity15 bays (15 plugs)
GPS Coordinates37.16780, -3.59638
Official ID2025000279
Official Registry DateMar 07, 2025

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Granada, belonging to the province of Granada (Andalucía, Spain). The charging equipment and commercial operation belong to the MAKSU ESPAÑA SL network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A
3Charging Bay #3
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A
4Charging Bay #4
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A
5Charging Bay #5
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A
6Charging Bay #6
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A
7Charging Bay #7
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A
8Charging Bay #8
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A
9Charging Bay #9
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A
10Charging Bay #10
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A
11Charging Bay #11
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A
12Charging Bay #12
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A
13Charging Bay #13
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A
14Charging Bay #14
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A
15Charging Bay #15
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2025000279
Post / EVSE Identifier #1COD20250000048727PR00001189
Post / EVSE Identifier #2ES*EPK*EGVI00031
Post / EVSE Identifier #3e567bc50-7a4f-11ee-95f9-a90488899206
Post / EVSE Identifier #4COD20250000048731PR00001193
Post / EVSE Identifier #5ES*EPK*EGVI00131
Post / EVSE Identifier #6e586dd10-7a4f-11ee-9bab-738191c13d0a
Post / EVSE Identifier #7COD20250000048730PR00001192
Post / EVSE Identifier #8ES*EPK*EGVI00071
Post / EVSE Identifier #9e5bfc760-7a4f-11ee-95f9-a90488899206
Post / EVSE Identifier #10COD20250000048735PR00001197
Post / EVSE Identifier #11ES*EPK*EGVI00041
Post / EVSE Identifier #12e5e46660-7a4f-11ee-95f9-a90488899206
Post / EVSE Identifier #13COD20250000048726PR00001188
Post / EVSE Identifier #14ES*EPK*EGVI00011
Post / EVSE Identifier #15e52b9db0-7a4f-11ee-95f9-a90488899206
Post / EVSE Identifier #16COD20250000048739PR00001201
Post / EVSE Identifier #17ES*EPK*EGVI00091
Post / EVSE Identifier #18e52e83e0-7a4f-11ee-95f9-a90488899206
Post / EVSE Identifier #19COD20250000048736PR00001198
Post / EVSE Identifier #20ES*EPK*EGVI00101
Post / EVSE Identifier #21e5b34440-7a4f-11ee-9bab-738191c13d0a
Post / EVSE Identifier #22COD20250000048732PR00001194
Post / EVSE Identifier #23ES*EPK*EGVI00151
Post / EVSE Identifier #24e5127082-7a4f-11ee-95f9-a90488899206
Post / EVSE Identifier #25COD20250000048738PR00001200
Post / EVSE Identifier #26ES*EPK*EGVI00061
Post / EVSE Identifier #27e5ed8e20-7a4f-11ee-95f9-a90488899206
Post / EVSE Identifier #28COD20250000048725PR00001187
Post / EVSE Identifier #29ES*EPK*EGVI00051
Post / EVSE Identifier #30e58ecc50-7a4f-11ee-9bab-738191c13d0a
Post / EVSE Identifier #31COD20250000048728PR00001190
Post / EVSE Identifier #32ES*EPK*EGVI00121
Post / EVSE Identifier #33e5afe8e0-7a4f-11ee-9bab-738191c13d0a
Post / EVSE Identifier #34COD20250000048729PR00001191
Post / EVSE Identifier #35ES*EPK*EGVI00141
Post / EVSE Identifier #36e512708d-7a4f-11ee-95f9-a90488899206
Post / EVSE Identifier #37COD20250000048734PR00001196
Post / EVSE Identifier #38ES*EPK*EGVI00111
Post / EVSE Identifier #39e56c7740-7a4f-11ee-95f9-a90488899206
Post / EVSE Identifier #40COD20250000048733PR00001195
Post / EVSE Identifier #41ES*EPK*EGVI00021
Post / EVSE Identifier #42e512708b-7a4f-11ee-95f9-a90488899206
Post / EVSE Identifier #43COD20250000048737PR00001199
Post / EVSE Identifier #44ES*EPK*EGVI00081
Post / EVSE Identifier #45e59757d0-7a4f-11ee-95f9-a90488899206

Theoretical Charging Times at Maximum Power (22 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~55 min(~0.9 hours)
40 kWh Battery~1 h 49 min(~1.8 hours)
60 kWh Battery~2 h 44 min(~2.7 hours)
80 kWh Battery~3 h 38 min(~3.6 hours)

Opening Hours

24/7

Supported Payment Methods

📱Mobile App (Remote activation & eMSP roaming)
💳RFID Card / Keyfob reader
✓PERFIL DE CARGA ADMITIDO

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 37.1677956 | Lon: -3.5963836View on OpenStreetMap →

Other Nearby Charging Stations

7.4 kW(Semi-fast)
150 m away

APK2 Escolapios

Calle Sos Del Rey Católico 11
Operator:EDP CLIENTES SAU
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
7.4 kW(Semi-fast)
480 m away

APK2 Puerta Real

Calle Acera Del Darro 40
Operator:EDP CLIENTES SAU
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
7.4 kW(Semi-fast)
830 m away

APK2 Arabial

Calle Arabial S/N
Operator:EDP CLIENTES SAU
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.