50 kW• Fast24/7Active in MITECO registry

Telpark - Calle Oriente

Carrer De L'orient, 17, 46410 Sueca, València, Sueca (46410), Valencia/València, Spain
Network OperatorMAKSU ESPAÑA SL
Total Capacity3 bays (3 plugs)
GPS Coordinates39.20437, -0.30773
Official ID2025000289
Official Registry DateMar 07, 2025

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Sueca, belonging to the province of Valencia/València (Comunitat Valenciana, Spain). The charging equipment and commercial operation belong to the MAKSU ESPAÑA SL network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
CCS Combo 2
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:125 V
Amperage:400 A
2Charging Bay #2
1 connector available
CHAdeMO
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:125 V
Amperage:400 A
3Charging Bay #3
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2025000289
Post / EVSE Identifier #1COD20250000048795PR00001257
Post / EVSE Identifier #2ES*EPK*ETEMP42
Post / EVSE Identifier #326425850-9153-11ef-abf2-35b1dcb6de22
Post / EVSE Identifier #4COD20250000048796PR00001258
Post / EVSE Identifier #5ES*EPK*ETEMP43
Post / EVSE Identifier #6COD20250000048797PR00001259
Post / EVSE Identifier #7ES*EPK*ETEMP41

Theoretical Charging Times at Maximum Power (50 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~24 min(~0.4 hours)
40 kWh Battery~48 min(~0.8 hours)
60 kWh Battery~1 h 12 min(~1.2 hours)
80 kWh Battery~1 h 36 min(~1.6 hours)

Opening Hours

24/7

Supported Payment Methods

✓PERFIL DE CARGA ADMITIDO
💳RFID Card / Keyfob reader
📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 39.2043672 | Lon: -0.3077282View on OpenStreetMap →

Other Nearby Charging Stations

12 kW(Semi-fast)
5.0 km away

Aquopolis Cullera

Antigua Carretera Nazaret-Oliva, km. 33, 4640
Operator:Punto Recargas SL
Tipo 2 (Mennekes)
13 points • 13 plugs
Details
120 kW(Fast)🛒Supermercado Consum
8.2 km away

SM Consum - El Perello 7

Roger De Lauria, 19
Operator:ERANOVUM E-MOBILITY, S.L.
CCS Combo 2Tipo 2 (Mennekes)
3 points • 5 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.