22 kW• Semi-fast24/7Active in MITECO registry

Telpark - Área Central

Rua De Berlín S/N, Pol.Fontiñas, S/N, Santiago de Compostela (15707), Coruña, A, Spain
Network OperatorMAKSU ESPAÑA SL
Total Capacity6 bays (6 plugs)
GPS Coordinates42.88312, -8.52927
Official ID2025000251
Official Registry DateMar 07, 2025

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Santiago de Compostela, belonging to the province of Coruña, A (Galicia, Spain). The charging equipment and commercial operation belong to the MAKSU ESPAÑA SL network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A
3Charging Bay #3
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A
4Charging Bay #4
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A
5Charging Bay #5
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A
6Charging Bay #6
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2025000251
Post / EVSE Identifier #1COD20250000048552PR00001014
Post / EVSE Identifier #2ES*EPK*ESAC00051
Post / EVSE Identifier #3e5c78f90-7a4f-11ee-9bab-738191c13d0a
Post / EVSE Identifier #4COD20250000048554PR00001016
Post / EVSE Identifier #5ES*EPK*EEVCC021431
Post / EVSE Identifier #6ccdae690-e60e-11ea-91b9-e7db7be04256
Post / EVSE Identifier #7COD20250000048553PR00001015
Post / EVSE Identifier #8ES*EPK*ESAC00041
Post / EVSE Identifier #9e58d93d0-7a4f-11ee-95f9-a90488899206
Post / EVSE Identifier #10COD20250000048555PR00001017
Post / EVSE Identifier #11ES*EPK*EEVCC021451
Post / EVSE Identifier #120c228bf0-e60f-11ea-91b9-e7db7be04256
Post / EVSE Identifier #13COD20250000048557PR00001019
Post / EVSE Identifier #14ES*EPK*ESAC00061
Post / EVSE Identifier #15e5a42910-7a4f-11ee-95f9-a90488899206
Post / EVSE Identifier #16COD20250000048556PR00001018
Post / EVSE Identifier #17ES*EPK*EEVCC021441
Post / EVSE Identifier #18f8665c90-e60e-11ea-91b9-e7db7be04256

Theoretical Charging Times at Maximum Power (22 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~55 min(~0.9 hours)
40 kWh Battery~1 h 49 min(~1.8 hours)
60 kWh Battery~2 h 44 min(~2.7 hours)
80 kWh Battery~3 h 38 min(~3.6 hours)

Opening Hours

24/7

Supported Payment Methods

✓PERFIL DE CARGA ADMITIDO
📱Mobile App (Remote activation & eMSP roaming)
💳RFID Card / Keyfob reader

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 42.883123 | Lon: -8.5292743View on OpenStreetMap →

Other Nearby Charging Stations

Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.