120 kW• Fast24/7Active in MITECO registry

Telpark - Alhóndiga

Alameda De Urquijo, 43, Bilbao (48010), Bizkaia, Spain
Network OperatorMAKSU ESPAÑA SL
Total Capacity10 bays (10 plugs)
GPS Coordinates43.25987, -2.93587
Official ID2025000238
Official Registry DateMar 07, 2025

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Bilbao, belonging to the province of Bizkaia (País Vasco, Spain). The charging equipment and commercial operation belong to the MAKSU ESPAÑA SL network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A
2Charging Bay #2
1 connector available
CCS Combo 2
120 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:500 V
Amperage:250 A
3Charging Bay #3
1 connector available
CCS Combo 2
120 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:500 V
Amperage:250 A
4Charging Bay #4
1 connector available
CCS Combo 2
120 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:500 V
Amperage:250 A
5Charging Bay #5
1 connector available
CCS Combo 2
120 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:500 V
Amperage:250 A
6Charging Bay #6
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A
7Charging Bay #7
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A
8Charging Bay #8
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A
9Charging Bay #9
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A
10Charging Bay #10
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2025000238
Post / EVSE Identifier #1COD20250000048427PR00000889
Post / EVSE Identifier #2ES*EPK*EEVCC012541
Post / EVSE Identifier #333cf7b44-c72e-11ea-9b85-c9ce18277160
Post / EVSE Identifier #4COD20250000048425PR00000887
Post / EVSE Identifier #5ES*EPK*EALHF0021
Post / EVSE Identifier #6226b5090-f9b1-11ee-bd7f-4ff1389404ee
Post / EVSE Identifier #7COD20250000048426PR00000888
Post / EVSE Identifier #8ES*EPK*EALHF0022
Post / EVSE Identifier #9COD20250000048423PR00000885
Post / EVSE Identifier #10ES*EPK*EALHF0011
Post / EVSE Identifier #1115d2acc0-f9b1-11ee-bd7f-4ff1389404ee
Post / EVSE Identifier #12COD20250000048424PR00000886
Post / EVSE Identifier #13ES*EPK*EALHF0012
Post / EVSE Identifier #14COD20250000048421PR00000883
Post / EVSE Identifier #15ES*EPK*EEVCC012491
Post / EVSE Identifier #1633d26172-c72e-11ea-9b85-c9ce18277160
Post / EVSE Identifier #17COD20250000048419PR00000881
Post / EVSE Identifier #18ES*EPK*EEVCC012571
Post / EVSE Identifier #1933cdcd92-c72e-11ea-9b85-c9ce18277160
Post / EVSE Identifier #20COD20250000048428PR00000890
Post / EVSE Identifier #21ES*EPK*EEVCC012551
Post / EVSE Identifier #2233d7b8a6-c72e-11ea-9b85-c9ce18277160
Post / EVSE Identifier #23COD20250000048420PR00000882
Post / EVSE Identifier #24ES*EPK*EEVCC012561
Post / EVSE Identifier #2533d6a734-c72e-11ea-9b85-c9ce18277160
Post / EVSE Identifier #26COD20250000048422PR00000884
Post / EVSE Identifier #27ES*EPK*EEVCC012521
Post / EVSE Identifier #2833d101e0-c72e-11ea-9b85-c9ce18277160

Theoretical Charging Times at Maximum Power (120 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~10 min(~0.2 hours)
40 kWh Battery~20 min(~0.3 hours)
60 kWh Battery~30 min(~0.5 hours)
80 kWh Battery~40 min(~0.7 hours)

Opening Hours

24/7

Supported Payment Methods

📱Mobile App (Remote activation & eMSP roaming)
💳RFID Card / Keyfob reader
✓PERFIL DE CARGA ADMITIDO

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 43.2598729 | Lon: -2.9358677View on OpenStreetMap →

Other Nearby Charging Stations

22 kW(Semi-fast)
860 m away

BI-Bilbao-007

Uribitarte,10
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
8 points • 8 plugs
Details
150 kW(Ultra-fast)
950 m away

BI-Bilbao-012

Abandoibarra,2
Operator:IBERDROLA CLIENTES S.A.U
CCS Combo 2
2 points • 2 plugs
Details
7 kW(Standard)
2.4 km away

BI-Bilbao-008

Benidorm,2
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
6 points • 6 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.