22 kW• Semi-fast24/7Active in MITECO registry

Tarragona - Selba EdRSR 4 Gavarres

1B Carrer 2 Tarragona Catalunya 43006 Es, 43006 Gavarres, Tarragona, Spain, Tarragona (43006), Tarragona, Spain
Network OperatorEtecnic Movilidad Electrica, SRL
Total Capacity2 bays (2 plugs)
GPS Coordinates41.12999, 1.20025
Official IDTIS65CQCTSJPEXREC7ZE
Official Registry DateJul 14, 2025

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Tarragona, belonging to the province of Tarragona (Cataluña, Spain). The charging equipment and commercial operation belong to the Etecnic Movilidad Electrica, SRL network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO CodeTIS65CQCTSJPEXREC7ZE
Post / EVSE Identifier #1FIQ8RP4EVVPWQ05QAABS5LAWQID
Post / EVSE Identifier #2ES*ETE*E432
Post / EVSE Identifier #3321955
Post / EVSE Identifier #4FO9F7UK12ILD4DFZ9GQK5VCNJ8D
Post / EVSE Identifier #5ES*ETE*E433
Post / EVSE Identifier #6321956

Theoretical Charging Times at Maximum Power (22 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~55 min(~0.9 hours)
40 kWh Battery~1 h 49 min(~1.8 hours)
60 kWh Battery~2 h 44 min(~2.7 hours)
80 kWh Battery~3 h 38 min(~3.6 hours)

Opening Hours

24/7

Supported Payment Methods

📱Mobile App (Remote activation & eMSP roaming)
💳RFID Card / Keyfob reader

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 41.129986 | Lon: 1.200249View on OpenStreetMap →

Other Nearby Charging Stations

22 kW(Semi-fast)
210 m away

T-REUS-004

Josep Maria Folch I Torres,3
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
4 points • 4 plugs
Details
150 kW(Ultra-fast)
330 m away

Media Markt Les Gavarres

Carrer Josep Maria Folch I Torres, 10, 43006
Operator:Punto Recargas SL
CHAdeMOCCS Combo 2
6 points • 6 plugs
Details
350 kW(Ultra-fast)
1.6 km away

Tarragona

Autovía Del Mediterráneo, A-7
Operator:IONITY GmbH Sucursal en España
CCS Combo 2
6 points • 6 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.