100 kW• Fast24/7Active in MITECO registry

Supermercado Pepe la Sal Moraira

Ctra. Moraira-Calpe Km 3, Benissa (03720), Alicante/Alacant, Spain
Network OperatorERANOVUM E-MOBILITY, S.L.
Total Capacity3 bays (5 plugs)
GPS Coordinates38.67770, 0.10602
Official ID2023002696
Official Registry DateSep 18, 2023

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Benissa, belonging to the province of Alicante/Alacant (Comunitat Valenciana, Spain). The charging equipment and commercial operation belong to the ERANOVUM E-MOBILITY, S.L. network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
2 connectors available
CCS Combo 2
100 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:250 A
CHAdeMO
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:250 A
2Charging Bay #2
1 connector available
CCS Combo 2
100 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:250 A
3Charging Bay #3
2 connectors available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:32 A
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:32 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2023002696
Post / EVSE Identifier #1COD20230000012046PR00001449
Post / EVSE Identifier #2ES*ERA*E16704
Post / EVSE Identifier #34
Post / EVSE Identifier #43
Post / EVSE Identifier #5COD20230000012047PR00001450
Post / EVSE Identifier #6ES*ERA*E16705
Post / EVSE Identifier #7COD20230000012048PR00001451
Post / EVSE Identifier #8ES*ERA*E16706
Post / EVSE Identifier #91
Post / EVSE Identifier #102

Theoretical Charging Times at Maximum Power (100 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~12 min(~0.2 hours)
40 kWh Battery~24 min(~0.4 hours)
60 kWh Battery~36 min(~0.6 hours)
80 kWh Battery~48 min(~0.8 hours)

Opening Hours

24/7

Supported Payment Methods

📱Mobile App (Remote activation & eMSP roaming)
💳RFID Card / Keyfob reader

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 38.6776956 | Lon: 0.1060201View on OpenStreetMap →

Other Nearby Charging Stations

100 kW(Fast)
5.3 km away

CC Alaire

Urbanizacion Poble, 3P, 03726 Alcasar, Alican
Operator:Punto Recargas SL
CCS Combo 2Tipo 2 (Mennekes)CHAdeMO
4 points • 4 plugs
Details
100 kW(Fast)
6.1 km away

Plaza Central Calpe

Av de los Ejércitos Españoles
Operator:Punto Recargas SL
Tipo 2 (Mennekes)CCS Combo 2CHAdeMO
4 points • 4 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.