60 kW• Fast🛒Supermercado BM24/7Active in MITECO registry

Supermercado BM Guadalix de la Sierra

Calle Egido, 32, Guadalix de la Sierra (28794), Madrid, Spain
Network OperatorERANOVUM E-MOBILITY, S.L.
Total Capacity2 bays (3 plugs)
GPS Coordinates40.78428, -3.69078
Official ID2024007328
Official Registry DateDec 02, 2024

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Guadalix de la Sierra, belonging to the province of Madrid (Madrid, Comunidad de, Spain). The charging equipment and commercial operation belong to the ERANOVUM E-MOBILITY, S.L. network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
7.4 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
2Charging Bay #2
2 connectors available
CCS Combo 2
60 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
CCS Combo 2
60 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2024007328
Post / EVSE Identifier #1COD20240000047231PR00019024
Post / EVSE Identifier #2ES*ERA*E25077
Post / EVSE Identifier #31
Post / EVSE Identifier #4COD20240000047232PR00019025
Post / EVSE Identifier #5ES*ERA*E25078
Post / EVSE Identifier #62

Theoretical Charging Times at Maximum Power (60 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~20 min(~0.3 hours)
40 kWh Battery~40 min(~0.7 hours)
60 kWh Battery~1 h(~1 hours)
80 kWh Battery~1 h 20 min(~1.3 hours)

Opening Hours

Martes (00:00 - 23:59) Miercoles (00:00 - 23:59) Lunes (00:00 - 23:59) Viernes (00:00 - 23:59) Jueves (00:00 - 23:59) Sabado (00:00 - 23:59) Domingo (00:00 - 23:59)

Supported Payment Methods

💳RFID Card / Keyfob reader
📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 40.78428 | Lon: -3.69078View on OpenStreetMap →

Other Nearby Charging Stations

7 kW(Standard)
180 m away

AYUNTAMIENTO

C/MAYOR
Operator:AYUNTAMIENTO DE GUADALIX DE LA SIERRA
Tipo 2 (Mennekes)
1 point • 1 plug
Details
11 kW(Semi-fast)
360 m away

C/PALENQUE

C/PALENQUE
Operator:AYUNTAMIENTO DE GUADALIX DE LA SIERRA
Tipo 2 (Mennekes)
1 point • 1 plug
Details
22 kW(Semi-fast)
430 m away

C/CHOZAS

C/CHOZAS
Operator:AYUNTAMIENTO DE GUADALIX DE LA SIERRA
Tipo 2 (Mennekes)
1 point • 1 plug
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.