120 kW• Fast🛒Supermercado Consum24/7Active in MITECO registry

SM Consum - Avenida de Levante 89

Avenida Del Levante U.D, 16, València (46025), Valencia/València, Spain
Network OperatorERANOVUM E-MOBILITY, S.L.
Total Capacity2 bays (4 plugs)
GPS Coordinates39.49492, -0.39103
Official ID2023002719
Official Registry DateSep 18, 2023

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of València, belonging to the province of Valencia/València (Comunitat Valenciana, Spain). The charging equipment and commercial operation belong to the ERANOVUM E-MOBILITY, S.L. network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
3 connectors available
CCS Combo 2
120 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:400 A
CCS Combo 2
120 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:400 A
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
7 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2023002719
Post / EVSE Identifier #1COD20230000012085PR00001488
Post / EVSE Identifier #2ES*ERA*E25870
Post / EVSE Identifier #31
Post / EVSE Identifier #42
Post / EVSE Identifier #53
Post / EVSE Identifier #6COD20230000012086PR00001489
Post / EVSE Identifier #7ES*ERA*E25209

Theoretical Charging Times at Maximum Power (120 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~10 min(~0.2 hours)
40 kWh Battery~20 min(~0.3 hours)
60 kWh Battery~30 min(~0.5 hours)
80 kWh Battery~40 min(~0.7 hours)

Opening Hours

24/7

Supported Payment Methods

📱Mobile App (Remote activation & eMSP roaming)
💳RFID Card / Keyfob reader

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 39.4949208 | Lon: -0.39103View on OpenStreetMap →

Other Nearby Charging Stations

22 kW(Semi-fast)
1.3 km away

V-Burjassot-004

Pont Trencat,1
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
4 points • 4 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.