11 kW• Semi-fast24/7Active in MITECO registry

Seur Tarragona

Ctra Valencia, 228, Tarragona (43006), Tarragona, Spain
Network OperatorREPSOL SOLUCIONES ENERGÉTICAS SA
Total Capacity4 bays (4 plugs)
GPS Coordinates41.11462, 1.20308
Official ID9DESNXSEM0MUKIJNAM82
Official Registry DateFeb 25, 2026

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Tarragona, belonging to the province of Tarragona (Cataluña, Spain). The charging equipment and commercial operation belong to the REPSOL SOLUCIONES ENERGÉTICAS SA network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
11 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
11 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
3Charging Bay #3
1 connector available
Tipo 2 (Mennekes)
11 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
4Charging Bay #4
1 connector available
Tipo 2 (Mennekes)
11 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code9DESNXSEM0MUKIJNAM82
Post / EVSE Identifier #1F1DJ2WZL5EUTCXQ8FLEMBYAFF2D
Post / EVSE Identifier #2ES*REP*E11638*1
Post / EVSE Identifier #31
Post / EVSE Identifier #4TS2PWIQXPN9JEOAHDXLYUIO2FED
Post / EVSE Identifier #5ES*REP*E11638*2
Post / EVSE Identifier #62
Post / EVSE Identifier #7NLRH0LSQJ6SEMVTQQTBNJKO4U0F
Post / EVSE Identifier #8ES*REP*E11642*1
Post / EVSE Identifier #97SSAKJLVXEWXK8GC6AUCAXNHOML
Post / EVSE Identifier #10ES*REP*E11642*2

Theoretical Charging Times at Maximum Power (11 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~1 h 49 min(~1.8 hours)
40 kWh Battery~3 h 38 min(~3.6 hours)
60 kWh Battery~5 h 27 min(~5.5 hours)
80 kWh Battery~7 h 16 min(~7.3 hours)

Opening Hours

24/7

Supported Payment Methods

📱Mobile App (Remote activation & eMSP roaming)
💳RFID Card / Keyfob reader

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 41.114624 | Lon: 1.203081View on OpenStreetMap →

Other Nearby Charging Stations

22 kW(Semi-fast)
650 m away

T-Tarragona-001

Vell De Salou,31
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
4 points • 4 plugs
Details
22 kW(Semi-fast)
1.9 km away

T-REUS-004

Josep Maria Folch I Torres,3
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
4 points • 4 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.