11.09 kW• Semi-fast24/7Active in MITECO registry

Seur Pamplona

Pol Noain-Esquiroz 0017 Piso:Bj Puerta:A, Valle de Elorz/Elortzibar (31110), Navarra, Spain
Network OperatorREPSOL SOLUCIONES ENERGÉTICAS SA
Total Capacity10 bays (10 plugs)
GPS Coordinates42.77477, -1.63826
Official IDO4MG1R8LLX03VCCMLHPP
Official Registry DateFeb 25, 2026

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Valle de Elorz/Elortzibar, belonging to the province of Navarra (Navarra, Comunidad Foral de, Spain). The charging equipment and commercial operation belong to the REPSOL SOLUCIONES ENERGÉTICAS SA network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
11.09 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
11.09 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
3Charging Bay #3
1 connector available
Tipo 2 (Mennekes)
11.09 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
4Charging Bay #4
1 connector available
Tipo 2 (Mennekes)
11.09 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
5Charging Bay #5
1 connector available
Tipo 2 (Mennekes)
11.09 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
6Charging Bay #6
1 connector available
Tipo 2 (Mennekes)
11.09 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
7Charging Bay #7
1 connector available
Tipo 2 (Mennekes)
11.09 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
8Charging Bay #8
1 connector available
Tipo 2 (Mennekes)
11.09 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
9Charging Bay #9
1 connector available
Tipo 2 (Mennekes)
11.09 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
10Charging Bay #10
1 connector available
Tipo 2 (Mennekes)
11.09 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO CodeO4MG1R8LLX03VCCMLHPP
Post / EVSE Identifier #10C7HREWMVGU9XTQIH6NSQEJAAOO
Post / EVSE Identifier #2ES*REP*E9809*1
Post / EVSE Identifier #31
Post / EVSE Identifier #498OOESDQKSGPCPVMO960MEV43MY
Post / EVSE Identifier #5ES*REP*E9809*2
Post / EVSE Identifier #62
Post / EVSE Identifier #7UDTQ9VQ2Z8K27EXEEL7J4H9UOJ6
Post / EVSE Identifier #8ES*REP*E9810*1
Post / EVSE Identifier #9SEX5FGFFIGGRAODE8AK90GRTITT
Post / EVSE Identifier #10ES*REP*E9810*2
Post / EVSE Identifier #11SKT5TZFUCR4VZ1PGEBMJP9Z5Z3V
Post / EVSE Identifier #12ES*REP*E17128*1
Post / EVSE Identifier #13DYRHAEOTBVKBTZOLCC4Z2UWMWAC
Post / EVSE Identifier #14ES*REP*E17128*2
Post / EVSE Identifier #156SDQYO1CTUP9XBNOVA6MODRLWX5
Post / EVSE Identifier #16ES*REP*E17129*1
Post / EVSE Identifier #17RVPSVGMT39TSMBECYECDGFV8RBO
Post / EVSE Identifier #18ES*REP*E17129*2
Post / EVSE Identifier #19AWC5RLFI6STOMXE9UU8CCRTLMBL
Post / EVSE Identifier #20ES*REP*E17131*1
Post / EVSE Identifier #21TGOQZHU6KRWN2KYN9L1OBASU8Y9
Post / EVSE Identifier #22ES*REP*E17131*2

Theoretical Charging Times at Maximum Power (11.09 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~1 h 48 min(~1.8 hours)
40 kWh Battery~3 h 36 min(~3.6 hours)
60 kWh Battery~5 h 25 min(~5.4 hours)
80 kWh Battery~7 h 13 min(~7.2 hours)

Opening Hours

24/7

Supported Payment Methods

💳RFID Card / Keyfob reader
📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 42.774766 | Lon: -1.638261View on OpenStreetMap →

Other Nearby Charging Stations

Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.