11.09 kW• Semi-fast24/7Active in MITECO registry

Seur Huesca

Rda. De La Industria, 30, Huesca (22006), Huesca, Spain
Network OperatorREPSOL SOLUCIONES ENERGÉTICAS SA
Total Capacity2 bays (2 plugs)
GPS Coordinates42.14830, -0.39150
Official ID5KI08BKJGCBRSJGS1C8E
Official Registry DateFeb 25, 2026

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Huesca, belonging to the province of Huesca (Aragón, Spain). The charging equipment and commercial operation belong to the REPSOL SOLUCIONES ENERGÉTICAS SA network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
11.09 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
11.09 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code5KI08BKJGCBRSJGS1C8E
Post / EVSE Identifier #1DYKBAF2KMUF1CXJYY5A4BBC5KNQ
Post / EVSE Identifier #2ES*REP*E16907*1
Post / EVSE Identifier #31
Post / EVSE Identifier #4BD3BZRQMCITL2ZUQXNXYNB8VJSV
Post / EVSE Identifier #5ES*REP*E16907*2
Post / EVSE Identifier #62

Theoretical Charging Times at Maximum Power (11.09 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~1 h 48 min(~1.8 hours)
40 kWh Battery~3 h 36 min(~3.6 hours)
60 kWh Battery~5 h 25 min(~5.4 hours)
80 kWh Battery~7 h 13 min(~7.2 hours)

Opening Hours

24/7

Supported Payment Methods

💳RFID Card / Keyfob reader
📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 42.148299 | Lon: -0.391504View on OpenStreetMap →

Other Nearby Charging Stations

22 kW(Semi-fast)
990 m away

E-HU-Huesca-001

Ramón Y Cajal,90
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
4 points • 4 plugs
Details
22 kW(Semi-fast)
2.0 km away

E-HU-Huesca-003

Monegros,8 - 10
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
22 kW(Semi-fast)🏨Hotel / Alojamiento
2.0 km away

HOTEL PEDRO I DE ARAGON SL

C/ DEL PARQUE, 34
Operator:HOTEL PEDRO I DE ARAGON SL
Tipo 2 (Mennekes)
1 point • 2 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.