11.09 kW• Semi-fast24/7Active in MITECO registry

Seur Castellón

Network OperatorREPSOL SOLUCIONES ENERGÉTICAS SA
Total Capacity12 bays (12 plugs)
GPS Coordinates39.96217, -0.06703
Official IDJHRWCDHVU39VLIO9AGJQ
Official Registry DateFeb 25, 2026

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Castelló de la Plana/Castellón de la Plana, belonging to the province of Castellón/Castelló (Comunitat Valenciana, Spain). The charging equipment and commercial operation belong to the REPSOL SOLUCIONES ENERGÉTICAS SA network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
11.09 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
11.09 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
3Charging Bay #3
1 connector available
Tipo 2 (Mennekes)
11.09 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
4Charging Bay #4
1 connector available
Tipo 2 (Mennekes)
11.09 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
5Charging Bay #5
1 connector available
Tipo 2 (Mennekes)
11.09 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
6Charging Bay #6
1 connector available
Tipo 2 (Mennekes)
11.09 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
7Charging Bay #7
1 connector available
Tipo 2 (Mennekes)
11.09 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
8Charging Bay #8
1 connector available
Tipo 2 (Mennekes)
11.09 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
9Charging Bay #9
1 connector available
Tipo 2 (Mennekes)
11.09 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
10Charging Bay #10
1 connector available
Tipo 2 (Mennekes)
11.09 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
11Charging Bay #11
1 connector available
Tipo 2 (Mennekes)
11.09 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
12Charging Bay #12
1 connector available
Tipo 2 (Mennekes)
11.09 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO CodeJHRWCDHVU39VLIO9AGJQ
Post / EVSE Identifier #1XDUQZUZKRFIRN2MQS6WNP2E7LYX
Post / EVSE Identifier #2ES*REP*E10365*1
Post / EVSE Identifier #31
Post / EVSE Identifier #4OWLJNL4ADS7D00ZIJMYCOZEDW92
Post / EVSE Identifier #5ES*REP*E10365*2
Post / EVSE Identifier #62
Post / EVSE Identifier #7DV2GLBJOSVDKZLOPPRWGVBJCCEN
Post / EVSE Identifier #8ES*REP*E16384*1
Post / EVSE Identifier #9GQJLEQVASSDGN4ZVCJPTMMIOPM7
Post / EVSE Identifier #10ES*REP*E16384*2
Post / EVSE Identifier #11LEVXBAEEXPR7IPGYPUGLCME0L2S
Post / EVSE Identifier #12ES*REP*E16385*1
Post / EVSE Identifier #13EUZPDV26JYEMABWXII1PA570ART
Post / EVSE Identifier #14ES*REP*E16385*2
Post / EVSE Identifier #159WWWD7JS3U7VBGXWRX2XT4JKMCO
Post / EVSE Identifier #16ES*REP*E17187*1
Post / EVSE Identifier #17AG3URKHXGYYLHCUQTH7ZQOELGB8
Post / EVSE Identifier #18ES*REP*E17187*2
Post / EVSE Identifier #19NGFFPHBY4XTLTUNOVPKEOD9GGOE
Post / EVSE Identifier #20ES*REP*E17188*1
Post / EVSE Identifier #21ZJCOH8B4FLJLY1ZLD8DZPDCFWLM
Post / EVSE Identifier #22ES*REP*E17188*2
Post / EVSE Identifier #23LSXEGPSPCPUQQQLQJ4J45FDTFI2
Post / EVSE Identifier #24ES*REP*E17189*1
Post / EVSE Identifier #25IZ3RATUEUTQ9DC2ZEWBC4STXYXF
Post / EVSE Identifier #26ES*REP*E17189*2

Theoretical Charging Times at Maximum Power (11.09 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~1 h 48 min(~1.8 hours)
40 kWh Battery~3 h 36 min(~3.6 hours)
60 kWh Battery~5 h 25 min(~5.4 hours)
80 kWh Battery~7 h 13 min(~7.2 hours)

Opening Hours

24/7

Supported Payment Methods

📱Mobile App (Remote activation & eMSP roaming)
💳RFID Card / Keyfob reader

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 39.96217 | Lon: -0.067032View on OpenStreetMap →

Other Nearby Charging Stations

22 kW(Semi-fast)
1.7 km away

CS-Castellondelaplana-013

Europa (Ciudad Del Transporte),1
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
4 points • 4 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.