50 kW• Fast24/7Active in MITECO registry

SE-Sevilla-030

Pirotecnia,3, Sevilla (41013), Sevilla, Spain
Network OperatorIBERDROLA CLIENTES S.A.U
Total Capacity4 bays (5 plugs)
GPS Coordinates37.37590, -5.97896
Official ID2024003451
Official Registry DateApr 07, 2025

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Sevilla, belonging to the province of Sevilla (Andalucía, Spain). The charging equipment and commercial operation belong to the IBERDROLA CLIENTES S.A.U network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
2 connectors available
CHAdeMO
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:500 V
Amperage:125 A
CCS Combo 2
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:500 V
Amperage:125 A
2Charging Bay #2
1 connector available
CCS Combo 2
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:500 V
Amperage:125 A
3Charging Bay #3
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:32 A
4Charging Bay #4
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:32 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2024003451
Post / EVSE Identifier #1COD20240000030482PR00008403
Post / EVSE Identifier #2ES*IBD*E157338
Post / EVSE Identifier #3166851
Post / EVSE Identifier #4166850
Post / EVSE Identifier #5COD20240000030483PR00008404
Post / EVSE Identifier #6ES*IBD*E157354
Post / EVSE Identifier #7166865
Post / EVSE Identifier #8COD20240000030484PR00008405
Post / EVSE Identifier #9ES*IBD*E229278
Post / EVSE Identifier #10241392
Post / EVSE Identifier #11COD20240000030485PR00008406
Post / EVSE Identifier #12ES*IBD*E229279
Post / EVSE Identifier #13241393

Theoretical Charging Times at Maximum Power (50 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~24 min(~0.4 hours)
40 kWh Battery~48 min(~0.8 hours)
60 kWh Battery~1 h 12 min(~1.2 hours)
80 kWh Battery~1 h 36 min(~1.6 hours)

Opening Hours

24/7

Supported Payment Methods

✓PAGO CON TARJETA DE DÉBITO
✓PAGO CON TARJETA DE CRÉDITO
📅Advance slot reservation supported
💳RFID Card / Keyfob reader
📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 37.375897 | Lon: -5.978962View on OpenStreetMap →

Other Nearby Charging Stations

7.4 kW(Semi-fast)
2.3 km away

APK2 Magdalena

San Pablo 1
Operator:EDP CLIENTES SAU
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.