50 kW• Fast24/7Active in MITECO registry

SE-DosHermanas-005

Universidades,N/A, Dos Hermanas (41704), Sevilla, Spain
Network OperatorIBERDROLA CLIENTES S.A.U
Total Capacity3 bays (5 plugs)
GPS Coordinates37.31523, -5.94200
Official ID2024002217
Official Registry DateApr 07, 2025

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Dos Hermanas, belonging to the province of Sevilla (Andalucía, Spain). The charging equipment and commercial operation belong to the IBERDROLA CLIENTES S.A.U network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
CCS Combo 2
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:500 V
Amperage:125 A
2Charging Bay #2
2 connectors available
CHAdeMO
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:500 V
Amperage:125 A
CCS Combo 2
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:500 V
Amperage:125 A
3Charging Bay #3
2 connectors available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:32 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2024002217
Post / EVSE Identifier #1COD20240000025989PR00005640
Post / EVSE Identifier #2ES*IBD*E8632
Post / EVSE Identifier #39192
Post / EVSE Identifier #4COD20240000025987PR00005638
Post / EVSE Identifier #5ES*IBD*E8614
Post / EVSE Identifier #69176
Post / EVSE Identifier #79175
Post / EVSE Identifier #8COD20240000025988PR00005639
Post / EVSE Identifier #9ES*IBD*E8615
Post / EVSE Identifier #109177
Post / EVSE Identifier #119178

Theoretical Charging Times at Maximum Power (50 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~24 min(~0.4 hours)
40 kWh Battery~48 min(~0.8 hours)
60 kWh Battery~1 h 12 min(~1.2 hours)
80 kWh Battery~1 h 36 min(~1.6 hours)

Opening Hours

24/7

Supported Payment Methods

💳RFID Card / Keyfob reader
✓PAGO CON TARJETA DE DÉBITO
📅Advance slot reservation supported
✓PAGO CON TARJETA DE CRÉDITO
📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 37.315229 | Lon: -5.941995View on OpenStreetMap →

Other Nearby Charging Stations

50 kW(Fast)
3.2 km away

WAY 2 Hermanas - exterior

Av. Ing. José Luis Prats 3
Operator:EDP CLIENTES SAU
Tipo 2 (Mennekes)CHAdeMOCCS Combo 2
6 points • 13 plugs
Details
7.4 kW(Semi-fast)
3.2 km away

WAY Dos hermanas

Av. Ing. José Luis Prats 3
Operator:EDP CLIENTES SAU
Tipo 2 (Mennekes)
49 points • 49 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.