7.59 kW• Semi-fast24/7Active in MITECO registry

Santiago de Compostela - Plaza Galicia

Plaza Galicia, S/N, Santiago de Compostela (15702), Coruña, A, Spain
Network OperatorP-APP & WEB SERVICIOS DIGITALES S.L.U.
Total Capacity8 bays (8 plugs)
GPS Coordinates42.87651, -8.54447
Official IDH7PFVGA4S4TMMXSR0STQ
Official Registry DateFeb 11, 2026

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Santiago de Compostela, belonging to the province of Coruña, A (Galicia, Spain). The charging equipment and commercial operation belong to the P-APP & WEB SERVICIOS DIGITALES S.L.U. network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
7.59 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:11 A
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
7.59 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:11 A
3Charging Bay #3
1 connector available
Tipo 2 (Mennekes)
7.59 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:11 A
4Charging Bay #4
1 connector available
Tipo 2 (Mennekes)
7.59 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:11 A
5Charging Bay #5
1 connector available
Tipo 2 (Mennekes)
7.59 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:11 A
6Charging Bay #6
1 connector available
Tipo 2 (Mennekes)
7.59 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:11 A
7Charging Bay #7
1 connector available
Tipo 2 (Mennekes)
7.59 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:11 A
8Charging Bay #8
1 connector available
Tipo 2 (Mennekes)
7.59 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:11 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO CodeH7PFVGA4S4TMMXSR0STQ
Post / EVSE Identifier #1WPYBJZP85I8FYX5VLZJLPGLEKNA
Post / EVSE Identifier #2ES*IPK*E6223220
Post / EVSE Identifier #31
Post / EVSE Identifier #4IU1AKN17RA5HTGGJRP0BWQSV1NL
Post / EVSE Identifier #5ES*IPK*E6223221
Post / EVSE Identifier #67KDJSBQ3CVDKLC85IQQZZCSUDA3
Post / EVSE Identifier #7ES*IPK*E6223222
Post / EVSE Identifier #8O8JVFXAU2UEJS02UFCUXHWYOV2M
Post / EVSE Identifier #9ES*IPK*E6223223
Post / EVSE Identifier #10L0W0EWGUIZHL2MYJ8KZFEV6EPY2
Post / EVSE Identifier #11ES*IPK*E6223224
Post / EVSE Identifier #12H6NCEHW6ITSLVBXXXXSTL71LUEP
Post / EVSE Identifier #13ES*IPK*E6223225
Post / EVSE Identifier #146NDXBPE3LFVNPNPTEJMO5DEK9QR
Post / EVSE Identifier #15ES*IPK*E6223226
Post / EVSE Identifier #16FQDPA2KDJAJSIGPA880X1U2MNY1
Post / EVSE Identifier #17ES*IPK*E6223227

Theoretical Charging Times at Maximum Power (7.59 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~2 h 38 min(~2.6 hours)
40 kWh Battery~5 h 16 min(~5.3 hours)
60 kWh Battery~7 h 54 min(~7.9 hours)
80 kWh Battery~10 h 32 min(~10.5 hours)

Opening Hours

Miercoles (00:00 - 00:00) Martes (00:00 - 00:00) Lunes (00:00 - 00:00) Domingo (00:00 - 00:00) Sabado (00:00 - 00:00) Viernes (00:00 - 00:00) Jueves (00:00 - 00:00)

Supported Payment Methods

📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Standard public access. Additional amenities: APARCAMIENTO

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 42.876515 | Lon: -8.544469View on OpenStreetMap →

Other Nearby Charging Stations

Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.