7.59 kW• Semi-fast24/7Active in MITECO registry

Santa Cruz de Tenerife - Tomé Cano

Avenida Heliodoro Rodríguez López, S/N, Santa Cruz de Tenerife (38005), Santa Cruz de Tenerife, Spain
Network OperatorP-APP & WEB SERVICIOS DIGITALES S.L.U.
Total Capacity6 bays (6 plugs)
GPS Coordinates28.46002, -16.26243
Official IDUKLSQTGQMTHQUOMXHVUU
Official Registry DateFeb 11, 2026

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Santa Cruz de Tenerife, belonging to the province of Santa Cruz de Tenerife (Canarias, Spain). The charging equipment and commercial operation belong to the P-APP & WEB SERVICIOS DIGITALES S.L.U. network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
7.59 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:11 A
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
7.59 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:11 A
3Charging Bay #3
1 connector available
Tipo 2 (Mennekes)
7.59 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:11 A
4Charging Bay #4
1 connector available
Tipo 2 (Mennekes)
7.59 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:11 A
5Charging Bay #5
1 connector available
Tipo 2 (Mennekes)
7.59 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:11 A
6Charging Bay #6
1 connector available
Tipo 2 (Mennekes)
7.59 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:11 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO CodeUKLSQTGQMTHQUOMXHVUU
Post / EVSE Identifier #177TIYNVFMMCC85ZMBIP6J1L45D3
Post / EVSE Identifier #2ES*IPK*E6249222
Post / EVSE Identifier #31
Post / EVSE Identifier #48PCK7FMAWQ6TNOVGCKVOSRCL3SU
Post / EVSE Identifier #5ES*IPK*E6249223
Post / EVSE Identifier #6VNFYWLO1XI2WAE3ISHDECGINJMH
Post / EVSE Identifier #7ES*IPK*E6249224
Post / EVSE Identifier #8LDNLCVNOHJ8AM29MHA68IQQFNQF
Post / EVSE Identifier #9ES*IPK*E6249225
Post / EVSE Identifier #10DQFCSENC0BW5OD9EPBW8WL3FYRH
Post / EVSE Identifier #11ES*IPK*E6249220
Post / EVSE Identifier #126M0MWLA1KUOOB3VKGGIJNZULX9K
Post / EVSE Identifier #13ES*IPK*E6249221

Theoretical Charging Times at Maximum Power (7.59 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~2 h 38 min(~2.6 hours)
40 kWh Battery~5 h 16 min(~5.3 hours)
60 kWh Battery~7 h 54 min(~7.9 hours)
80 kWh Battery~10 h 32 min(~10.5 hours)

Opening Hours

Martes (00:00 - 00:00) Lunes (00:00 - 00:00) Miercoles (00:00 - 00:00) Jueves (00:00 - 00:00) Viernes (00:00 - 00:00) Domingo (00:00 - 00:00) Sabado (00:00 - 00:00)

Supported Payment Methods

📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Standard public access. Additional amenities: APARCAMIENTO

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 28.46002 | Lon: -16.26243View on OpenStreetMap →

Other Nearby Charging Stations

22 kW(Semi-fast)
550 m away

LA SALLE III

Av. Tres De Mayo, 26
Operator:Prio Recharge Sl.
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
55 kW(Fast)
550 m away

LA SALLE IV

Av. Tres De Mayo, 26
Operator:Prio Recharge Sl.
CCS Combo 2CHAdeMOTipo 2 (Mennekes)
2 points • 3 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.