50 kW• Fast24/7Active in MITECO registry

Rubén Dario, Chamberí. Madrid

Paseo De La Castellana, 33, Madrid (28010), Madrid, Spain
Network OperatorWenea Services Spain, S.L.
Total Capacity3 bays (3 plugs)
GPS Coordinates40.43183, -3.68914
Official ID2025000083
Official Registry DateAug 21, 2026

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Madrid, belonging to the province of Madrid (Madrid, Comunidad de, Spain). The charging equipment and commercial operation belong to the Wenea Services Spain, S.L. network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:230 V
Amperage:32 A
2Charging Bay #2
1 connector available
CHAdeMO
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:125 A
3Charging Bay #3
1 connector available
CCS Combo 2
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:125 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2025000083
Post / EVSE Identifier #1COD20250000047985PR00000308
Post / EVSE Identifier #2ES*WEN*EMADPDC33013
Post / EVSE Identifier #3132b5726-6e97-2adb-3f41-7fe046f5cea2
Post / EVSE Identifier #4COD20250000047986PR00000309
Post / EVSE Identifier #5ES*WEN*EMADPDC33012
Post / EVSE Identifier #6c1af91d9-430a-6bf5-ef04-e4d5e6bb459c
Post / EVSE Identifier #7COD20250000047987PR00000310
Post / EVSE Identifier #8ES*WEN*EMADPDC33011
Post / EVSE Identifier #90ce7b81b-eb65-c5de-8dd2-eee6f6712c05

Theoretical Charging Times at Maximum Power (50 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~24 min(~0.4 hours)
40 kWh Battery~48 min(~0.8 hours)
60 kWh Battery~1 h 12 min(~1.2 hours)
80 kWh Battery~1 h 36 min(~1.6 hours)

Opening Hours

24/7

Supported Payment Methods

📱Mobile App (Remote activation & eMSP roaming)
💳RFID Card / Keyfob reader

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 40.431835 | Lon: -3.689138View on OpenStreetMap →

Other Nearby Charging Stations

50 kW(Fast)
7.4 km away

M-Madrid-078

Hilario Herranz Establos,24
Operator:IBERDROLA CLIENTES S.A.U
CHAdeMOCCS Combo 2
2 points • 3 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.