22.17 kW• Semi-fast24/7Active in MITECO registry

Restaurante Bonamb

Carretera Benitachell, 100, Xàbia/Jávea (03730), Alicante/Alacant, Spain
Network OperatorREPSOL SOLUCIONES ENERGÉTICAS SA
Total Capacity4 bays (4 plugs)
GPS Coordinates38.77000, 0.14772
Official IDIKXVR3N6PJGALVFRGMOW
Official Registry DateFeb 25, 2026

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Xàbia/Jávea, belonging to the province of Alicante/Alacant (Comunitat Valenciana, Spain). The charging equipment and commercial operation belong to the REPSOL SOLUCIONES ENERGÉTICAS SA network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
22.17 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
22.17 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
3Charging Bay #3
1 connector available
Tipo 2 (Mennekes)
22.17 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
4Charging Bay #4
1 connector available
Tipo 2 (Mennekes)
22.17 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO CodeIKXVR3N6PJGALVFRGMOW
Post / EVSE Identifier #1B4YTUKN1OD8TDSMFXB0F1ASTO0H
Post / EVSE Identifier #2ES*REP*E17178*1
Post / EVSE Identifier #31
Post / EVSE Identifier #4QDMQHMUO5WY1ZJZL0DS7MRDAJTI
Post / EVSE Identifier #5ES*REP*E17178*2
Post / EVSE Identifier #62
Post / EVSE Identifier #7TVEECGXWZWP4PAYYCVY23N1S4XV
Post / EVSE Identifier #8ES*REP*E17179*1
Post / EVSE Identifier #9ZBVQ3DMXF4EEGTTYUYEHHZLHHZU
Post / EVSE Identifier #10ES*REP*E17179*2

Theoretical Charging Times at Maximum Power (22.17 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~54 min(~0.9 hours)
40 kWh Battery~1 h 48 min(~1.8 hours)
60 kWh Battery~2 h 42 min(~2.7 hours)
80 kWh Battery~3 h 37 min(~3.6 hours)

Opening Hours

24/7

Supported Payment Methods

💳RFID Card / Keyfob reader
📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 38.77 | Lon: 0.14772View on OpenStreetMap →

Other Nearby Charging Stations

100 kW(Fast)
6.0 km away

CC Alaire

Urbanizacion Poble, 3P, 03726 Alcasar, Alican
Operator:Punto Recargas SL
CCS Combo 2Tipo 2 (Mennekes)CHAdeMO
4 points • 4 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.