100 kW• Fast24/7Active in MITECO registry

Rest. Nou Urbisol

Avda. Montserrat, 2, Castellolí (08719), Barcelona, Spain
Network OperatorWENEA HIGHWAYS OESTE, SLU
Total Capacity2 bays (2 plugs)
GPS Coordinates41.59935, 1.70109
Official IDESGTPP9LUNBMQSRFYQ9M
Official Registry DateFeb 04, 2026

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Castellolí, belonging to the province of Barcelona (Cataluña, Spain). The charging equipment and commercial operation belong to the WENEA HIGHWAYS OESTE, SLU network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
CCS Combo 2
100 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:250 A
2Charging Bay #2
1 connector available
CCS Combo 2
100 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:250 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO CodeESGTPP9LUNBMQSRFYQ9M
Post / EVSE Identifier #1CV7C76PC4ZILKL9XYKDC5NXC6FR
Post / EVSE Identifier #2ES*WHO*ENOUURBISOL12
Post / EVSE Identifier #3ad2a2984-751e-be6f-d8b6-a07c8cc7b209
Post / EVSE Identifier #4CNZLIWBB4ZSVOGPBYUG9QYCYDCE
Post / EVSE Identifier #5ES*WHO*ENOUURBISOL11
Post / EVSE Identifier #668de4dce-477b-309d-810a-c3792eecb700

Theoretical Charging Times at Maximum Power (100 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~12 min(~0.2 hours)
40 kWh Battery~24 min(~0.4 hours)
60 kWh Battery~36 min(~0.6 hours)
80 kWh Battery~48 min(~0.8 hours)

Opening Hours

24/7

Supported Payment Methods

📱Mobile App (Remote activation & eMSP roaming)
💳RFID Card / Keyfob reader

Accessibility & Amenities

Standard public access. Additional amenities: CAFETERÍA, ESTACIÓN DE SERVICIO, ESTACIÓN DE TREN, USO COMPARTIDO DE BICICLETAS, ESTACIÓN DE METRO, RESTAURANTE, INSTALACIÓN DEPORTIVA, HOTEL, APARCAMIENTO, SUPERMERCADO, APARCAMIENTO DE VEHÍCULOS COMPARTIDOS, PARADA DE TRAM, WIFI, NATURALEZA, MUSEO, CENTRO COMERCIAL, PARADA DE TAXI, PARADA DE AUTOBÚS, AEROPUERTO, ZONA RECREATIVA

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 41.599353 | Lon: 1.701087View on OpenStreetMap →

Other Nearby Charging Stations

50 kW(Fast)🏨Hotel / Alojamiento
5.6 km away

ACCIONA - Hotel Bruc

Hqv9+R2 El Bruc, España
Operator:ACCIONA Recarga
CCS Combo 2CHAdeMOTipo 2 (Mennekes)
2 points • 3 plugs
Details
150 kW(Ultra-fast)
15.0 km away

B-Masquefa-001

Pedrosa - Plg Pedrosa Est Servicio,5
Operator:IBERDROLA CLIENTES S.A.U
CCS Combo 2
2 points • 2 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.