7.36 kW• Standard⛽Estación Repsol24/7Active in MITECO registry

Repsol, Refinería Tarragona, Deslastres

Corredor Del Virgili, Tarragona (43006), Tarragona, Spain
Network OperatorREPSOL SOLUCIONES ENERGÉTICAS SA
Total Capacity4 bays (4 plugs)
GPS Coordinates41.09531, 1.19545
Official IDHTJYXS8QPBKA6AGPAZXP
Official Registry DateFeb 25, 2026

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Tarragona, belonging to the province of Tarragona (Cataluña, Spain). The charging equipment and commercial operation belong to the REPSOL SOLUCIONES ENERGÉTICAS SA network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
7.36 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
7.36 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
3Charging Bay #3
1 connector available
Tipo 2 (Mennekes)
7.36 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
4Charging Bay #4
1 connector available
Tipo 2 (Mennekes)
7.36 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO CodeHTJYXS8QPBKA6AGPAZXP
Post / EVSE Identifier #1RGJVCK3COCNUAA5RBFUIBF8AKQQ
Post / EVSE Identifier #2ES*REP*E15928*1
Post / EVSE Identifier #31
Post / EVSE Identifier #4ZRP9KQ93B18EPU4BVZGLRWELTD6
Post / EVSE Identifier #5ES*REP*E15928*2
Post / EVSE Identifier #62
Post / EVSE Identifier #7I1NQ2DAJZV4NNEL0E5JWX8W6DDF
Post / EVSE Identifier #8ES*REP*E15929*1
Post / EVSE Identifier #95GN4KVH8W2TS6NFUQRXGTZR2OE3
Post / EVSE Identifier #10ES*REP*E15929*2

Theoretical Charging Times at Maximum Power (7.36 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~2 h 43 min(~2.7 hours)
40 kWh Battery~5 h 26 min(~5.4 hours)
60 kWh Battery~8 h 9 min(~8.2 hours)
80 kWh Battery~10 h 52 min(~10.9 hours)

Opening Hours

24/7

Supported Payment Methods

💳RFID Card / Keyfob reader
📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 41.095309 | Lon: 1.195452View on OpenStreetMap →

Other Nearby Charging Stations

22 kW(Semi-fast)
2.3 km away

T-Tarragona-001

Vell De Salou,31
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
4 points • 4 plugs
Details
350 kW(Ultra-fast)
4.0 km away

Tarragona

Autovía Del Mediterráneo, A-7
Operator:IONITY GmbH Sucursal en España
CCS Combo 2
6 points • 6 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.