7.36 kW• Standard⛽Estación Repsol24/7Active in MITECO registry

Repsol Puertollano, Parking de oficinas generales (Quimica)

Carretera Calzada, S/N,, Puertollano (13500), Ciudad Real, Spain
Network OperatorREPSOL SOLUCIONES ENERGÉTICAS SA
Total Capacity4 bays (4 plugs)
GPS Coordinates38.68128, -4.05686
Official ID3Q49NR78UB6OOQTAZFIZ
Official Registry DateFeb 25, 2026

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Puertollano, belonging to the province of Ciudad Real (Castilla - La Mancha, Spain). The charging equipment and commercial operation belong to the REPSOL SOLUCIONES ENERGÉTICAS SA network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
7.36 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
7.36 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
3Charging Bay #3
1 connector available
Tipo 2 (Mennekes)
7.36 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
4Charging Bay #4
1 connector available
Tipo 2 (Mennekes)
7.36 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code3Q49NR78UB6OOQTAZFIZ
Post / EVSE Identifier #1YDBNJ7DAXLHGFNYKBYKFKVXEXRB
Post / EVSE Identifier #2ES*REP*E12073*1
Post / EVSE Identifier #31
Post / EVSE Identifier #4DTHHFZDY976FQSC8TYWZK83Z4IU
Post / EVSE Identifier #5ES*REP*E12073*2
Post / EVSE Identifier #62
Post / EVSE Identifier #76JNKEQUOTY2FOQBKKJDCEZDZPOV
Post / EVSE Identifier #8ES*REP*E12074*1
Post / EVSE Identifier #94ZFJU1RXJJVNZPAOATUCHKSYHXM
Post / EVSE Identifier #10ES*REP*E12074*2

Theoretical Charging Times at Maximum Power (7.36 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~2 h 43 min(~2.7 hours)
40 kWh Battery~5 h 26 min(~5.4 hours)
60 kWh Battery~8 h 9 min(~8.2 hours)
80 kWh Battery~10 h 52 min(~10.9 hours)

Opening Hours

24/7

Supported Payment Methods

📱Mobile App (Remote activation & eMSP roaming)
💳RFID Card / Keyfob reader

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 38.681283 | Lon: -4.056859View on OpenStreetMap →

Other Nearby Charging Stations

Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.