22.17 kW• Semi-fast⛽Estación Repsol24/7Active in MITECO registry

Repsol, Lezama, Parking público

Barrio Garaioltza, 147 Athletic Club, Campos De Entrenamiento En Lezama. Parking Público Campo 8, Lezama (48196), Bizkaia, Spain
Network OperatorREPSOL SOLUCIONES ENERGÉTICAS SA
Total Capacity8 bays (10 plugs)
GPS Coordinates43.27628, -2.83823
Official IDONG7HOPGFEXBWQMZQGLZ
Official Registry DateFeb 25, 2026

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Lezama, belonging to the province of Bizkaia (País Vasco, Spain). The charging equipment and commercial operation belong to the REPSOL SOLUCIONES ENERGÉTICAS SA network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
22.17 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
22.17 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
3Charging Bay #3
1 connector available
Tipo 2 (Mennekes)
7.36 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
4Charging Bay #4
1 connector available
Tipo 2 (Mennekes)
7.36 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
5Charging Bay #5
1 connector available
Tipo 2 (Mennekes)
7.36 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
6Charging Bay #6
1 connector available
Tipo 2 (Mennekes)
7.36 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
7Charging Bay #7
2 connectors available
Tipo 1 (Yazaki)
7.36 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Tipo 2 (Mennekes)
7.36 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
8Charging Bay #8
2 connectors available
Tipo 1 (Yazaki)
7.36 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Tipo 2 (Mennekes)
7.36 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO CodeONG7HOPGFEXBWQMZQGLZ
Post / EVSE Identifier #1P7UMORCXIXQ7XBDEZKJAEPLSUIH
Post / EVSE Identifier #2ES*REP*E4530*1
Post / EVSE Identifier #31
Post / EVSE Identifier #4SWW7KR0JYFB1JBLXDKILWPV669L
Post / EVSE Identifier #5ES*REP*E4530*2
Post / EVSE Identifier #62
Post / EVSE Identifier #7TQE80VURPUWPULNBHIRSIP8TPUT
Post / EVSE Identifier #8ES*REP*E4531*1
Post / EVSE Identifier #9BLCIVVOV4SDTC1I4Y05JTYOLSD1
Post / EVSE Identifier #10ES*REP*E4531*2
Post / EVSE Identifier #11MFM5MUII3PRWULQEX6HNLWYKEBG
Post / EVSE Identifier #12ES*REP*E4532*1
Post / EVSE Identifier #13GEFDMSBNRI870RB8HURKRWJFTF6
Post / EVSE Identifier #14ES*REP*E4532*2
Post / EVSE Identifier #15EBBJRVRAYURRPBGPF4BYPZSKLYG
Post / EVSE Identifier #16ES*REP*E4533*1
Post / EVSE Identifier #17S2SGMYN2WUISWCRVCVT0YPCCGWD
Post / EVSE Identifier #18ES*REP*E4534*1

Theoretical Charging Times at Maximum Power (22.17 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~54 min(~0.9 hours)
40 kWh Battery~1 h 48 min(~1.8 hours)
60 kWh Battery~2 h 42 min(~2.7 hours)
80 kWh Battery~3 h 37 min(~3.6 hours)

Opening Hours

24/7

Supported Payment Methods

💳RFID Card / Keyfob reader
📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 43.276279 | Lon: -2.83823View on OpenStreetMap →

Other Nearby Charging Stations

7 kW(Standard)
270 m away

BI-Lezama-003

Garaioltza,146
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.