7.36 kW• Standard⛽Estación Repsol24/7Active in MITECO registry

Repsol, José Mardones, Vía pública

C/ José Mardones, S/N, Vitoria-Gasteiz (01002), Araba/Álava, Spain
Network OperatorREPSOL SOLUCIONES ENERGÉTICAS SA
Total Capacity3 bays (4 plugs)
GPS Coordinates42.84856, -2.66555
Official IDHWLTXBO59BZSMPIIRVS2
Official Registry DateFeb 25, 2026

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Vitoria-Gasteiz, belonging to the province of Araba/Álava (País Vasco, Spain). The charging equipment and commercial operation belong to the REPSOL SOLUCIONES ENERGÉTICAS SA network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
2 connectors available
Schuko (Enchufe doméstico)
3.68 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Tipo 2 (Mennekes)
3.68 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
7.36 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
3Charging Bay #3
1 connector available
Tipo 2 (Mennekes)
7.36 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO CodeHWLTXBO59BZSMPIIRVS2
Post / EVSE Identifier #1SZ0GFLRD9IRER1IVKMW16S4ZJAL
Post / EVSE Identifier #2ES*REP*E2358*1
Post / EVSE Identifier #31
Post / EVSE Identifier #42
Post / EVSE Identifier #52DLMNTXXID6ZLOQMZ3RXZYKHLUG
Post / EVSE Identifier #6ES*REP*E3479*1
Post / EVSE Identifier #79CMZ80BNUFFXS9OBZGMJZGC4BCM
Post / EVSE Identifier #8ES*REP*E3479*2

Theoretical Charging Times at Maximum Power (7.36 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~2 h 43 min(~2.7 hours)
40 kWh Battery~5 h 26 min(~5.4 hours)
60 kWh Battery~8 h 9 min(~8.2 hours)
80 kWh Battery~10 h 52 min(~10.9 hours)

Opening Hours

24/7

Supported Payment Methods

📱Mobile App (Remote activation & eMSP roaming)
💳RFID Card / Keyfob reader

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 42.848561 | Lon: -2.665555View on OpenStreetMap →

Other Nearby Charging Stations

7.4 kW(Semi-fast)
1.1 km away

APK2 Juan de Ayala

Plaza De Francisco Juan De Ayala 1
Operator:EDP CLIENTES SAU
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.