90 kW• Fast⛽Estación Repsol24/7Active in MITECO registry

Repsol, Guarroman

Cr N-4 P.K. 280,00 D, Guarromán (23210), Jaén, Spain
Network OperatorREPSOL SOLUCIONES ENERGÉTICAS SA
Total Capacity1 bay (1 plug)
GPS Coordinates38.19646, -3.67331
Official IDGJONPLH7FMZAYW6EZOBY
Official Registry DateFeb 25, 2026

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Guarromán, belonging to the province of Jaén (Andalucía, Spain). The charging equipment and commercial operation belong to the REPSOL SOLUCIONES ENERGÉTICAS SA network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
CCS Combo 2
90 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO CodeGJONPLH7FMZAYW6EZOBY
Post / EVSE Identifier #1YRQOM9UJNODF1JGIMNEQV8HSU7N
Post / EVSE Identifier #2ES*REP*E16062*1
Post / EVSE Identifier #31

Theoretical Charging Times at Maximum Power (90 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~13 min(~0.2 hours)
40 kWh Battery~27 min(~0.4 hours)
60 kWh Battery~40 min(~0.7 hours)
80 kWh Battery~53 min(~0.9 hours)

Opening Hours

24/7

Supported Payment Methods

📱Mobile App (Remote activation & eMSP roaming)
💳RFID Card / Keyfob reader

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 38.196457 | Lon: -3.673307View on OpenStreetMap →

Other Nearby Charging Stations

60 kW(Fast)
1.6 km away

C6E06BCC21DVCEMJZN

Av. De Andalucia, 111, 23210 Guarromán,
Operator:ENDESA X WAY, S.L.
CCS Combo 2
2 points • 2 plugs
Details
50 kW(Fast)
5.3 km away

61934038200018

Carretera Madrid Cadiz Km 275, 23211
Operator:ENDESA X WAY, S.L.
CCS Combo 2CHAdeMOTipo 2 (Mennekes)
3 points • 3 plugs
Details
150 kW(Ultra-fast)
7.4 km away

Guarromán, Spain

Polígono Industrial De Guadiel, Sn
Operator:Tesla Spain SLU
Tipo 2 (Mennekes)CCS Combo 2
10 points • 20 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.