50 kW• Fast⛽Estación Repsol24/7Active in MITECO registry

Repsol ES, Santa Cruz de Mudela II

Cr N-4, 216,9, Santa Cruz de Mudela (13730), Ciudad Real, Spain
Network OperatorREPSOL SOLUCIONES ENERGÉTICAS SA
Total Capacity1 bay (3 plugs)
GPS Coordinates38.63555, -3.47158
Official IDV6A8O5P3A47PTZHTZDYJ
Official Registry DateFeb 25, 2026

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Santa Cruz de Mudela, belonging to the province of Ciudad Real (Castilla - La Mancha, Spain). The charging equipment and commercial operation belong to the REPSOL SOLUCIONES ENERGÉTICAS SA network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
3 connectors available
Tipo 2 (Mennekes)
43.65 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
CCS Combo 2
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
CHAdeMO
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO CodeV6A8O5P3A47PTZHTZDYJ
Post / EVSE Identifier #1ZJFWO0KQ7AU9T7LMJUENPMZXJXG
Post / EVSE Identifier #2ES*REP*E14119*1
Post / EVSE Identifier #31
Post / EVSE Identifier #42
Post / EVSE Identifier #53

Theoretical Charging Times at Maximum Power (50 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~24 min(~0.4 hours)
40 kWh Battery~48 min(~0.8 hours)
60 kWh Battery~1 h 12 min(~1.2 hours)
80 kWh Battery~1 h 36 min(~1.6 hours)

Opening Hours

24/7

Supported Payment Methods

💳RFID Card / Keyfob reader
📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 38.635555 | Lon: -3.471584View on OpenStreetMap →

Other Nearby Charging Stations

50 kW(Fast)🏨Hotel / Alojamiento
50 m away

61934038200010

Hotel Restaurante Santa Cruz - A-4, 217,
Operator:ENDESA X WAY, S.L.
CCS Combo 2CHAdeMOTipo 2 (Mennekes)
3 points • 3 plugs
Details
50 kW(Fast)
70 m away

61934038200005

Restaurante Santa Cruz - Autovia Del Sur
Operator:ENDESA X WAY, S.L.
CCS Combo 2CHAdeMOTipo 2 (Mennekes)
3 points • 3 plugs
Details
21 kW(Semi-fast)
1.9 km away

21XP22T3KK4AM00335

Ctra. Torrenueva, 13730, Ciudad Real, Spain
Operator:ENDESA X WAY, S.L.
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.