50 kW• Fast⛽Estación Repsol24/7Active in MITECO registry

Repsol ES, Grupo Electrochimpo S.L.

Cr C-402, 106,3, Villacañas (45860), Toledo, Spain
Network OperatorREPSOL SOLUCIONES ENERGÉTICAS SA
Total Capacity1 bay (3 plugs)
GPS Coordinates39.61608, -3.34460
Official IDE5SCENDT2TUFYFSZTLBS
Official Registry DateFeb 25, 2026

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Villacañas, belonging to the province of Toledo (Castilla - La Mancha, Spain). The charging equipment and commercial operation belong to the REPSOL SOLUCIONES ENERGÉTICAS SA network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
3 connectors available
Tipo 2 (Mennekes)
43.65 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
CCS Combo 2
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
CHAdeMO
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO CodeE5SCENDT2TUFYFSZTLBS
Post / EVSE Identifier #1MMVZBTQJSDQRJ4TPMVGBA0R0HVA
Post / EVSE Identifier #2ES*REP*E14171*1
Post / EVSE Identifier #31
Post / EVSE Identifier #42
Post / EVSE Identifier #53

Theoretical Charging Times at Maximum Power (50 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~24 min(~0.4 hours)
40 kWh Battery~48 min(~0.8 hours)
60 kWh Battery~1 h 12 min(~1.2 hours)
80 kWh Battery~1 h 36 min(~1.6 hours)

Opening Hours

24/7

Supported Payment Methods

📱Mobile App (Remote activation & eMSP roaming)
💳RFID Card / Keyfob reader

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 39.616078 | Lon: -3.3446View on OpenStreetMap →

Other Nearby Charging Stations

7.4 kW(Semi-fast)
1.5 km away

Villacañas

Avenida De La Mancha 32
Operator:EDP CLIENTES SAU
Tipo 2 (Mennekes)
1 point • 2 plugs
Details
150 kW(Ultra-fast)
15.8 km away

TotalEnergies - Rest. Albaraka

Av. Andalucia, 94
Operator:TotalEnergies Charging Services España, SLU
CCS Combo 2Tipo 2 (Mennekes)CHAdeMO
4 points • 4 plugs
Details
100 kW(Fast)
18.7 km away

TotalEnergies - Rest. Santa Ana

Restaurante Santa Ana A-4, Km 112
Operator:TotalEnergies Charging Services España, SLU
CCS Combo 2Tipo 2 (Mennekes)CHAdeMO
5 points • 5 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.