180 kW• Ultra-fast⛽Estación Repsol24/7Active in MITECO registry

Repsol ES, CRED Tudela

Au A-68, 222, Fontellas (31512), Navarra, Spain
Network OperatorREPSOL SOLUCIONES ENERGÉTICAS SA
Total Capacity4 bays (4 plugs)
GPS Coordinates42.01253, -1.60107
Official IDUVWE8BUEVNUDRKPJBQND
Official Registry DateFeb 25, 2026

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Fontellas, belonging to the province of Navarra (Navarra, Comunidad Foral de, Spain). The charging equipment and commercial operation belong to the REPSOL SOLUCIONES ENERGÉTICAS SA network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
CCS Combo 2
180 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
2Charging Bay #2
1 connector available
CCS Combo 2
180 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
3Charging Bay #3
1 connector available
CCS Combo 2
180 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
4Charging Bay #4
1 connector available
CCS Combo 2
180 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO CodeUVWE8BUEVNUDRKPJBQND
Post / EVSE Identifier #18XCOCZ6TDZP6SDF64GWMQCE1JTJ
Post / EVSE Identifier #2ES*REP*E10898*1
Post / EVSE Identifier #31
Post / EVSE Identifier #4XJNGJNGX4N3JGYLCJOU3ZXNFIEY
Post / EVSE Identifier #5ES*REP*E10898*2
Post / EVSE Identifier #62
Post / EVSE Identifier #73CPLBGAGDFL0MERG0E5E2TTLAUC
Post / EVSE Identifier #8ES*REP*E10900*1
Post / EVSE Identifier #9LR5UMONNOWZBGKRLRJ1CBRXJBWF
Post / EVSE Identifier #10ES*REP*E10900*2

Theoretical Charging Times at Maximum Power (180 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~7 min(~0.1 hours)
40 kWh Battery~13 min(~0.2 hours)
60 kWh Battery~20 min(~0.3 hours)
80 kWh Battery~27 min(~0.4 hours)

Opening Hours

24/7

Supported Payment Methods

💳RFID Card / Keyfob reader
📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 42.012531 | Lon: -1.601074View on OpenStreetMap →

Other Nearby Charging Stations

350 kW(Ultra-fast)
50 m away

IONITY Tudela Sur

Ap-68 Km 223, Area De Servicio De Tudela Sentido Zaragoza
Operator:IONITY GmbH Sucursal en España
CCS Combo 2
2 points • 2 plugs
Details
350 kW(Ultra-fast)
60 m away

IONITY Tudela Norte

Ap-68, Km 223 Área De Servicio De Tudela Sentido Logrono
Operator:IONITY GmbH Sucursal en España
CCS Combo 2
2 points • 2 plugs
Details
150 kW(Ultra-fast)
3.1 km away

NA-Tudela-008

Canal De Mañeru,2
Operator:IBERDROLA CLIENTES S.A.U
CCS Combo 2
2 points • 2 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.