50 kW• Fast⛽Estación Repsol24/7Active in MITECO registry

Repsol, DC - Arroyo De La Luz

Circular Fab, Av. José Fragoso Lucas, S/N, Arroyo de la Luz (10900), Cáceres, Spain
Network OperatorREPSOL SOLUCIONES ENERGÉTICAS SA
Total Capacity1 bay (3 plugs)
GPS Coordinates39.47838, -6.57515
Official IDHTCW3SCGNHCVUGTHFRD8
Official Registry DateFeb 25, 2026

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Arroyo de la Luz, belonging to the province of Cáceres (Extremadura, Spain). The charging equipment and commercial operation belong to the REPSOL SOLUCIONES ENERGÉTICAS SA network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
3 connectors available
CCS Combo 2
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
CHAdeMO
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Tipo 2 (Mennekes)
43.65 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO CodeHTCW3SCGNHCVUGTHFRD8
Post / EVSE Identifier #1VZPOG5KCPDCJWPKLNWZCUKVIOCI
Post / EVSE Identifier #2ES*REP*E15375*1
Post / EVSE Identifier #31
Post / EVSE Identifier #42
Post / EVSE Identifier #53

Theoretical Charging Times at Maximum Power (50 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~24 min(~0.4 hours)
40 kWh Battery~48 min(~0.8 hours)
60 kWh Battery~1 h 12 min(~1.2 hours)
80 kWh Battery~1 h 36 min(~1.6 hours)

Opening Hours

24/7

Supported Payment Methods

💳RFID Card / Keyfob reader
📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 39.478383 | Lon: -6.575154View on OpenStreetMap →

Other Nearby Charging Stations

22 kW(Semi-fast)
11.5 km away

61947051020029

Ctra. Alburquerque, 1, 10550 Aliseda,
Operator:ENDESA X WAY, S.L.
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
22 kW(Semi-fast)
11.5 km away

61949051030029

Ctra. Alburquerque, 1, 10550 Aliseda,
Operator:ENDESA X WAY, S.L.
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
22 kW(Semi-fast)
14.2 km away

CASAR DE CÁCERES

C. Zona Peri-Industrial, 27A
Operator:OESTE SOLUCIONES ENERGETICAS, S.L.
Tipo 2 (Mennekes)
1 point • 2 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.