100 kW• Fast24/7Active in MITECO registry

Q8 Gasolinera Higuerón

Estrella Vega,20, Sevilla (41015), Sevilla, Spain
Network OperatorCHARGING TOGETHER SL
Total Capacity2 bays (3 plugs)
GPS Coordinates37.42970, -5.96893
Official IDORVVSTLZZWOTBDYIOKVK
Official Registry DateMay 27, 2025

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Sevilla, belonging to the province of Sevilla (Andalucía, Spain). The charging equipment and commercial operation belong to the CHARGING TOGETHER SL network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
CCS Combo 2
⚡ 800V100 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:1000 V (Alta Tensión)
Amperage:400 A
2Charging Bay #2
2 connectors available
CHAdeMO
80 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:500 V
Amperage:200 A
CCS Combo 2
⚡ 800V100 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:1000 V (Alta Tensión)
Amperage:400 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO CodeORVVSTLZZWOTBDYIOKVK
Post / EVSE Identifier #1V31WS8T6GT7KITTEEUWM6JKCFIW
Post / EVSE Identifier #2ES*FCT*E230358
Post / EVSE Identifier #3242530
Post / EVSE Identifier #41W24ZIDIOL9YUBOMYUO7YT6VWWD
Post / EVSE Identifier #5ES*FCT*E230359
Post / EVSE Identifier #6242531
Post / EVSE Identifier #7242532

Theoretical Charging Times at Maximum Power (100 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~12 min(~0.2 hours)
40 kWh Battery~24 min(~0.4 hours)
60 kWh Battery~36 min(~0.6 hours)
80 kWh Battery~48 min(~0.8 hours)

Opening Hours

24/7

Supported Payment Methods

💳RFID Card / Keyfob reader
✓PAGO CON TARJETA DE DÉBITO
✓PAGO CON TARJETA DE CRÉDITO
📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 37.429705 | Lon: -5.968926View on OpenStreetMap →

Other Nearby Charging Stations

100 kW(Fast)
240 m away

Senda 5

Carretera Sevilla, 5, 41015 Sevilla, Spain
Operator:Punto Recargas SL
CCS Combo 2
2 points • 2 plugs
Details
7.4 kW(Semi-fast)
5.0 km away

APK2 Magdalena

San Pablo 1
Operator:EDP CLIENTES SAU
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.