100 kW• Fast24/7Active in MITECO registry

Q8 Gasolinera Gavá

Enginy, 30-32. Pi Les Massotes,0, Montcada i Reixac (08840), Barcelona, Spain
Network OperatorCHARGING TOGETHER SL
Total Capacity2 bays (2 plugs)
GPS Coordinates41.30230, 2.01690
Official IDHSKZTOSWKAAY1QRGWNTF
Official Registry DateJul 10, 2026

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Montcada i Reixac, belonging to the province of Barcelona (Cataluña, Spain). The charging equipment and commercial operation belong to the CHARGING TOGETHER SL network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
CCS Combo 2
⚡ 800V100 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:1000 V (Alta Tensión)
Amperage:350 A
2Charging Bay #2
1 connector available
CCS Combo 2
⚡ 800V100 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:1000 V (Alta Tensión)
Amperage:350 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO CodeHSKZTOSWKAAY1QRGWNTF
Post / EVSE Identifier #1MTZLGTZ7NYDZWPEO3IGQCLGJ5FO
Post / EVSE Identifier #2ES*FCT*E232524
Post / EVSE Identifier #3244779
Post / EVSE Identifier #4MHSHARNGVQAZYWJSDY95SWGFMDU
Post / EVSE Identifier #5ES*FCT*E232525
Post / EVSE Identifier #6244780

Theoretical Charging Times at Maximum Power (100 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~12 min(~0.2 hours)
40 kWh Battery~24 min(~0.4 hours)
60 kWh Battery~36 min(~0.6 hours)
80 kWh Battery~48 min(~0.8 hours)

Opening Hours

24/7

Supported Payment Methods

💳RFID Card / Keyfob reader
📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 41.3023 | Lon: 2.0169View on OpenStreetMap →

Other Nearby Charging Stations

100 kW(Fast)🏬Centro Comercial
1.1 km away

Centro Comercial Barnasud

Carrer del Progrés, 69, 08850 Gavà, Barcelo
Operator:Punto Recargas SL
CHAdeMOCCS Combo 2Tipo 2 (Mennekes)
4 points • 5 plugs
Details
12 kW(Semi-fast)🏬Centro Comercial
1.1 km away

Centro Comercial Barnasud (EXP)

Carrer del Progrés, 69, 08850 Gavà, Barcelo
Operator:Punto Recargas SL
Tipo 2 (Mennekes)
20 points • 20 plugs
Details
100 kW(Fast)🏨Hotel / Alojamiento
3.5 km away

Hotel IBIS Castelldefels

Passeo Del Ferrocarril, 342
Operator:Punto Recargas SL
CCS Combo 2Tipo 2 (Mennekes)CHAdeMO
8 points • 8 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.