22 kW• Semi-fast24/7Active in MITECO registry

Punto de recarga 4

C/ Son Serra, s/n Poliesportiu, Bunyola (07110), Balears, Illes, Spain
Network OperatorAJUNTAMENT DE BUNYOLA
Total Capacity2 bays (2 plugs)
GPS Coordinates39.68676, 2.69894
Official ID2024003530
Official Registry DateMay 09, 2024

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Bunyola, belonging to the province of Balears, Illes (Balears, Illes, Spain). The charging equipment and commercial operation belong to the AJUNTAMENT DE BUNYOLA network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2024003530
Post / EVSE Identifier #1COD20240000031486PR00008615
Post / EVSE Identifier #2ES*814*E-05
Post / EVSE Identifier #3ES*81405*E
Post / EVSE Identifier #4COD20240000031487PR00008616
Post / EVSE Identifier #5ES*814*E-06
Post / EVSE Identifier #6ES*81406*E

Theoretical Charging Times at Maximum Power (22 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~55 min(~0.9 hours)
40 kWh Battery~1 h 49 min(~1.8 hours)
60 kWh Battery~2 h 44 min(~2.7 hours)
80 kWh Battery~3 h 38 min(~3.6 hours)

Opening Hours

24/7

Supported Payment Methods

✓PERFIL DE CARGA ADMITIDO

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 39.6867588 | Lon: 2.69893675View on OpenStreetMap →

Other Nearby Charging Stations

22 kW(Semi-fast)
130 m away

Punto de recarga 3

C/ Son Serra, s/n Poliesportiu
Operator:AJUNTAMENT DE BUNYOLA
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
22 kW(Semi-fast)
580 m away

Punto de recarga 1

C/ del Garrigo, 2
Operator:AJUNTAMENT DE BUNYOLA
Tipo 2 (Mennekes)
1 point • 1 plug
Details
22 kW(Semi-fast)
580 m away

Punto de recarga 2

C/ del Garrigo, 2
Operator:AJUNTAMENT DE BUNYOLA
Tipo 2 (Mennekes)
1 point • 1 plug
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.