22 kW• Semi-fast24/7Active in MITECO registry

Plaça Espanya, 8

Passeig Estació, 33D, 43550 Ulldecona, Tarragona, Spain, Borges del Camp, Les (43550), Tarragona, Spain
Network OperatorEtecnic Movilidad Electrica, SRL
Total Capacity2 bays (2 plugs)
GPS Coordinates40.59604, 0.44943
Official IDEUAA4ZNWNEJ8DSSCQZYW
Official Registry DateJul 14, 2025

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Borges del Camp, Les, belonging to the province of Tarragona (Cataluña, Spain). The charging equipment and commercial operation belong to the Etecnic Movilidad Electrica, SRL network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO CodeEUAA4ZNWNEJ8DSSCQZYW
Post / EVSE Identifier #1OJIMUUSJIIDI2LD1TE6JYK3WZ2X
Post / EVSE Identifier #2ES*ETE*E690
Post / EVSE Identifier #3100035509
Post / EVSE Identifier #46W4RK0D3AGTOMJYCBR3ZWC5N8CE
Post / EVSE Identifier #5ES*ETE*E691
Post / EVSE Identifier #6100060459

Theoretical Charging Times at Maximum Power (22 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~55 min(~0.9 hours)
40 kWh Battery~1 h 49 min(~1.8 hours)
60 kWh Battery~2 h 44 min(~2.7 hours)
80 kWh Battery~3 h 38 min(~3.6 hours)

Opening Hours

24/7

Supported Payment Methods

💳RFID Card / Keyfob reader
📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 40.596044 | Lon: 0.449434View on OpenStreetMap →

Other Nearby Charging Stations

22 kW(Semi-fast)
12.8 km away

E-CS-Vinaros-001

Viejo De Rosell,2
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
6 points • 6 plugs
Details
60 kW(Fast)🛒Supermercado Consum
14.1 km away

Supermercado Consum Vinaròs

Carrer De La Mare De Déu Del Pilar, S/N, 12500 Vinaròs, Castelló
Operator:ERANOVUM E-MOBILITY, S.L.
Tipo 2 (Mennekes)CCS Combo 2
2 points • 3 plugs
Details
22 kW(Semi-fast)
15.6 km away

CS-VINAROS-005

Dels Artesans,6
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
4 points • 4 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.