150 kW• Ultra-fast24/7Active in MITECO registry

Petritegi Sagardotegia

Petritegi Bidea, 8, Donostia/San Sebastián (20014), Gipuzkoa, Spain
Network OperatorWENEA EMOBILITY SERVICES S.L.
Total Capacity4 bays (4 plugs)
GPS Coordinates43.29049, -1.94121
Official ID2024004474
Official Registry DateJun 24, 2024

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Donostia/San Sebastián, belonging to the province of Gipuzkoa (País Vasco, Spain). The charging equipment and commercial operation belong to the WENEA EMOBILITY SERVICES S.L. network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
CCS Combo 2
150 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:375 A
2Charging Bay #2
1 connector available
CHAdeMO
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:125 A
3Charging Bay #3
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:230 V
Amperage:32 A
4Charging Bay #4
1 connector available
CCS Combo 2
150 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:375 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2024004474
Post / EVSE Identifier #1COD20240000036607PR00011744
Post / EVSE Identifier #2ES*WEN*EPETRITEGI14
Post / EVSE Identifier #317e24cb1-fed7-4065-59b6-af7f5d750c8b
Post / EVSE Identifier #4COD20240000036608PR00011745
Post / EVSE Identifier #5ES*WEN*EPETRITEGI13
Post / EVSE Identifier #632edc404-9df8-d81c-1af7-e64ba2851aba
Post / EVSE Identifier #7COD20240000036609PR00011746
Post / EVSE Identifier #8ES*WEN*EPETRITEGI12
Post / EVSE Identifier #99936208c-0cc3-232a-0b68-d4df38948687
Post / EVSE Identifier #10COD20240000036610PR00011747
Post / EVSE Identifier #11ES*WEN*EPETRITEGI11
Post / EVSE Identifier #1291936c05-e96b-1d83-7965-f07a3c57e780

Theoretical Charging Times at Maximum Power (150 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~8 min(~0.1 hours)
40 kWh Battery~16 min(~0.3 hours)
60 kWh Battery~24 min(~0.4 hours)
80 kWh Battery~32 min(~0.5 hours)

Opening Hours

Martes (00:00 - 23:59) Sabado (00:00 - 23:59) Viernes (00:00 - 23:59) Lunes (00:00 - 23:59) Miercoles (00:00 - 23:59) Jueves (00:00 - 23:59) Domingo (00:00 - 23:59)

Supported Payment Methods

💳RFID Card / Keyfob reader
📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 43.29049 | Lon: -1.94121View on OpenStreetMap →

Other Nearby Charging Stations

50 kW(Fast)
2.2 km away

SS-SanSebastian-001

Begiristain Dok. Ps,75
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)CHAdeMOCCS Combo 2
2 points • 3 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.