240 kW• Ultra-fast24/7Active in MITECO registry

P.C. Toledo Fusión

Avenida Río Guadiana, 14, Toledo (45007), Toledo, Spain
Network OperatorWenea Services Spain, S.L.
Total Capacity16 bays (16 plugs)
GPS Coordinates39.86212, -3.98063
Official IDJZ2CW9CWKCPMLTW4KC8Z
Official Registry DateJan 20, 2026

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Toledo, belonging to the province of Toledo (Castilla - La Mancha, Spain). The charging equipment and commercial operation belong to the Wenea Services Spain, S.L. network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
CCS Combo 2
240 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:600 A
2Charging Bay #2
1 connector available
CCS Combo 2
240 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:600 A
3Charging Bay #3
1 connector available
CCS Combo 2
240 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:600 A
4Charging Bay #4
1 connector available
CCS Combo 2
240 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:600 A
5Charging Bay #5
1 connector available
CCS Combo 2
240 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:600 A
6Charging Bay #6
1 connector available
CCS Combo 2
240 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:600 A
7Charging Bay #7
1 connector available
CCS Combo 2
240 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:600 A
8Charging Bay #8
1 connector available
CCS Combo 2
240 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:600 A
9Charging Bay #9
1 connector available
CCS Combo 2
240 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:600 A
10Charging Bay #10
1 connector available
CCS Combo 2
240 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:600 A
11Charging Bay #11
1 connector available
CCS Combo 2
240 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:600 A
12Charging Bay #12
1 connector available
CCS Combo 2
240 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:600 A
13Charging Bay #13
1 connector available
CCS Combo 2
240 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:600 A
14Charging Bay #14
1 connector available
CCS Combo 2
240 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:600 A
15Charging Bay #15
1 connector available
CCS Combo 2
240 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:600 A
16Charging Bay #16
1 connector available
CCS Combo 2
240 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:600 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO CodeJZ2CW9CWKCPMLTW4KC8Z
Post / EVSE Identifier #1O2GPATDUGDUSO2B3HLWM7R7UZOZ
Post / EVSE Identifier #2ES*WEN*ECCTOLEDOFUSION11
Post / EVSE Identifier #3a1b34cd0-fb14-a1a8-1acc-6ffefdfcd296
Post / EVSE Identifier #4XBEEHLVVFN7XIWSCKA4LTWJGU86
Post / EVSE Identifier #5ES*WEN*ECCTOLEDOFUSION12
Post / EVSE Identifier #6f37c2ab3-44f8-16cd-ad8b-7b36d6bc6355
Post / EVSE Identifier #7GPLLDN5YRK7ZOCQJ6TRHPPMTQRO
Post / EVSE Identifier #8ES*WEN*ECCTOLEDOFUSION21
Post / EVSE Identifier #93bd7c1da-2836-ea30-48c5-e04699ea1f71
Post / EVSE Identifier #10FXBMOPNMSIH0P38ANJO7RCP8XYK
Post / EVSE Identifier #11ES*WEN*ECCTOLEDOFUSION22
Post / EVSE Identifier #127cf7932b-1223-6a29-1674-09fa425c31a3
Post / EVSE Identifier #13SCWTAM9WE5YNANQHZHHMOBSGWGH
Post / EVSE Identifier #14ES*WEN*ECCTOLEDOFUSION31
Post / EVSE Identifier #157df6b5ce-1a67-4ab8-cb83-a46a436b2af7
Post / EVSE Identifier #160DWP7WRH8X9ZG5KJZTSRCK77KQV
Post / EVSE Identifier #17ES*WEN*ECCTOLEDOFUSION32
Post / EVSE Identifier #189d4aa093-5b3e-a448-d054-44cb6d6e723c
Post / EVSE Identifier #197JO0RL7CA2QFDOZ9SZQPBJAKLUS
Post / EVSE Identifier #20ES*WEN*ECCTOLEDOFUSION41
Post / EVSE Identifier #218bd7f209-edf7-2509-dc34-97565ffee001
Post / EVSE Identifier #2284L04O517BY8RR7FAEGROAZQYEW
Post / EVSE Identifier #23ES*WEN*ECCTOLEDOFUSION42
Post / EVSE Identifier #24d2e5befd-85a4-2be8-9c69-d6a09ccbda5a
Post / EVSE Identifier #25NDHKJQDSVZ7PZGDLJZTWSK7FVYY
Post / EVSE Identifier #26ES*WEN*ECCTOLEDOFUSION51
Post / EVSE Identifier #2775f513f2-c5cc-206c-6518-3a113537fad2
Post / EVSE Identifier #28IIM0IUVTFZN6SELZ0WWSPEJWX3K
Post / EVSE Identifier #29ES*WEN*ECCTOLEDOFUSION52
Post / EVSE Identifier #3022d4dc0e-5069-0944-f793-e2b2fb604a9e
Post / EVSE Identifier #31IBUEUFRVX2SLTEUBMEGLTCXCIRK
Post / EVSE Identifier #32ES*WEN*ECCTOLEDOFUSION61
Post / EVSE Identifier #3376526b71-1eef-002a-db0f-c6c973774e3f
Post / EVSE Identifier #34ZFPUCSB5R2F3NVUUL8P9UR9S7NV
Post / EVSE Identifier #35ES*WEN*ECCTOLEDOFUSION62
Post / EVSE Identifier #369783e6de-688f-b68f-d1cc-444e77880ce1
Post / EVSE Identifier #37XCOT9ORVVXUNWNG9DCLF9OHZDLF
Post / EVSE Identifier #38ES*WEN*ECCTOLEDOFUSION71
Post / EVSE Identifier #39e652f538-4319-fdce-74cc-c69fb525f403
Post / EVSE Identifier #40BFPANUUNZZLWSM2UOMIZNE1HIRQ
Post / EVSE Identifier #41ES*WEN*ECCTOLEDOFUSION72
Post / EVSE Identifier #42a0cfe45b-cf1c-f5dd-b379-0d138f25bca0
Post / EVSE Identifier #436KFREVFED53BKWREHKLKN5J6CNI
Post / EVSE Identifier #44ES*WEN*ECCTOLEDOFUSION82
Post / EVSE Identifier #4505f06a8c-e78a-4d69-d14c-6b98d0e823a9
Post / EVSE Identifier #46DLAULKT1CO66VGPOCMVNU8LG5EW
Post / EVSE Identifier #47ES*WEN*ECCTOLEDOFUSION81
Post / EVSE Identifier #48fca33377-fe7c-0f00-280a-d8001e131a1a

Theoretical Charging Times at Maximum Power (240 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~5 min(~0.1 hours)
40 kWh Battery~10 min(~0.2 hours)
60 kWh Battery~15 min(~0.3 hours)
80 kWh Battery~20 min(~0.3 hours)

Opening Hours

24/7

Supported Payment Methods

💳RFID Card / Keyfob reader
📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 39.862124 | Lon: -3.980628View on OpenStreetMap →

Other Nearby Charging Stations

250 kW(Ultra-fast)
570 m away

Toledo, Spain

Av. Del Río Boladiez
Operator:Tesla Spain SLU
CCS Combo 2
8 points • 8 plugs
Details
11 kW(Semi-fast)
1.9 km away

NUEVO HOSPITAL DE TOLEDO

AVENIDA DEL RIO GUADIANA, SN
Operator:REMO SUSTAINABLE MOBILITY S.L
Tipo 2 (Mennekes)
34 points • 34 plugs
Details
60 kW(Fast)
2.0 km away

US_55_Toledo_II

Calle Río Jarama
Operator:PLENOIL, S.L.
Tipo 2 (Mennekes)
1 point • 1 plug
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.