22 kW• Semi-fast24/7Active in MITECO registry

Parque Industrial Cosentino Cantoria

Ctra A-334, Salida 60, Cantoria (04850), Almería, Spain
Network OperatorCOSENTINO INDUSTRIAL, S.A.U.
Total Capacity1 bay (18 plugs)
GPS Coordinates37.36639, -2.24222
Official ID2025000189
Official Registry DateFeb 13, 2025

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Cantoria, belonging to the province of Almería (Andalucía, Spain). The charging equipment and commercial operation belong to the COSENTINO INDUSTRIAL, S.A.U. network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
18 connectors available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2025000189
Post / EVSE Identifier #1COD20250000048976PR00000577
Post / EVSE Identifier #2ES*CSN*E000000001
Post / EVSE Identifier #3Punto1
Post / EVSE Identifier #4Punto2
Post / EVSE Identifier #5Punto3
Post / EVSE Identifier #6Punto4
Post / EVSE Identifier #7Punto5
Post / EVSE Identifier #8Punto6
Post / EVSE Identifier #9Punto7
Post / EVSE Identifier #10Punto8
Post / EVSE Identifier #11Punto9
Post / EVSE Identifier #12Punto10
Post / EVSE Identifier #13Punto11
Post / EVSE Identifier #14Punto12
Post / EVSE Identifier #15Punto13
Post / EVSE Identifier #16Punto14
Post / EVSE Identifier #17Punto15
Post / EVSE Identifier #18Punto16
Post / EVSE Identifier #19Punto17
Post / EVSE Identifier #20Punto18

Theoretical Charging Times at Maximum Power (22 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~55 min(~0.9 hours)
40 kWh Battery~1 h 49 min(~1.8 hours)
60 kWh Battery~2 h 44 min(~2.7 hours)
80 kWh Battery~3 h 38 min(~3.6 hours)

Opening Hours

24/7

Supported Payment Methods

✓PERFIL DE CARGA ADMITIDO

Accessibility & Amenities

Accessibility: SI. Additional amenities: APARCAMIENTO

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 37.3663888 | Lon: -2.2422222View on OpenStreetMap →

Other Nearby Charging Stations

22 kW(Semi-fast)🏨Hotel / Alojamiento
4.1 km away

Hotel restaurante La Tejera

Av. de la Legión Española, S/N
Operator:JARDINES LA TEJERA, S.A.U.
Tipo 2 (Mennekes)
1 point • 3 plugs
Details
22 kW(Semi-fast)
4.1 km away

E-AL-OlulaDelRio-001

De La Legión Española,S/N
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
4 points • 4 plugs
Details
22 kW(Semi-fast)
9.4 km away

E-AL-Albox-001

Lepanto,S/N
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
4 points • 4 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.