22 kW• Semi-fast24/7Active in MITECO registry

Parque de Miraflores. Sevilla

Calle Ojiva, 4, Sevilla (41008), Sevilla, Spain
Network OperatorWenea Services Spain, S.L.
Total Capacity2 bays (2 plugs)
GPS Coordinates37.40875, -5.96563
Official IDCBHVFF2EVFWXZBBN2SBE
Official Registry DateMay 27, 2025

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Sevilla, belonging to the province of Sevilla (Andalucía, Spain). The charging equipment and commercial operation belong to the Wenea Services Spain, S.L. network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:230 V
Amperage:32 A
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:230 V
Amperage:32 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO CodeCBHVFF2EVFWXZBBN2SBE
Post / EVSE Identifier #1Y46XDHEBKZ5MTDEYLYN131JDPMC
Post / EVSE Identifier #2ES*WEN*ESEVMIRAFLORES11
Post / EVSE Identifier #3c9c68b4a-95be-595d-29f8-363b23c4c079
Post / EVSE Identifier #4SSYCLPRIW6XMV2SLGZQ788W1ONO
Post / EVSE Identifier #5ES*WEN*ESEVMIRAFLORES12
Post / EVSE Identifier #697bd0928-1fb4-e823-4db9-50d5e59aab03

Theoretical Charging Times at Maximum Power (22 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~55 min(~0.9 hours)
40 kWh Battery~1 h 49 min(~1.8 hours)
60 kWh Battery~2 h 44 min(~2.7 hours)
80 kWh Battery~3 h 38 min(~3.6 hours)

Opening Hours

24/7

Supported Payment Methods

💳RFID Card / Keyfob reader
📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 37.408747 | Lon: -5.965631View on OpenStreetMap →

Other Nearby Charging Stations

100 kW(Fast)
2.2 km away

Senda 5

Carretera Sevilla, 5, 41015 Sevilla, Spain
Operator:Punto Recargas SL
CCS Combo 2
2 points • 2 plugs
Details
22 kW(Semi-fast)🏨Hotel / Alojamiento
2.9 km away

Hotel Hesperia Sevilla

Av. Eduardo Dato, 49
Operator:WENEA EMOBILITY SERVICES S.L.
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.