7 kW• Standard🅿️Parking24/7Active in MITECO registry

Parking NN La Rotonda - CIRCUTOR EdRSR 1

Pg. De Sta. Gervasi, 51, Barcelona (08022), Barcelona, Spain
Network OperatorEtecnic Movilidad Electrica, SRL
Total Capacity3 bays (3 plugs)
GPS Coordinates41.41066, 2.13740
Official ID2LZHWZXLAKSMY05UFQBX
Official Registry DateJul 14, 2025

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Barcelona, belonging to the province of Barcelona (Cataluña, Spain). The charging equipment and commercial operation belong to the Etecnic Movilidad Electrica, SRL network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
7 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
7 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A
3Charging Bay #3
1 connector available
Tipo 2 (Mennekes)
7 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2LZHWZXLAKSMY05UFQBX
Post / EVSE Identifier #16NSUWQGRGMW35NEQ4WAGF2I4K4D
Post / EVSE Identifier #2ES*ETE*E25366
Post / EVSE Identifier #3100005283
Post / EVSE Identifier #4AUPZJIVIEREPBBQXGWGXQCLF8DP
Post / EVSE Identifier #5ES*ETE*E27759
Post / EVSE Identifier #6100008635
Post / EVSE Identifier #7FLFOONEGGEVEVSLYY5TDQDHOOUK
Post / EVSE Identifier #8ES*ETE*E25367
Post / EVSE Identifier #9100005284

Theoretical Charging Times at Maximum Power (7 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~2 h 51 min(~2.9 hours)
40 kWh Battery~5 h 43 min(~5.7 hours)
60 kWh Battery~8 h 34 min(~8.6 hours)
80 kWh Battery~11 h 26 min(~11.4 hours)

Opening Hours

24/7

Supported Payment Methods

📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 41.41066 | Lon: 2.137401View on OpenStreetMap →

Other Nearby Charging Stations

Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.