11 kW• Semi-fast🅿️ParkingActive in MITECO registry

Parking La Llama

C. Pintor Varela, 8A, Torrelavega (39300), Cantabria, Spain
Network OperatorTotalEnergies Charging Services España, SLU
Total Capacity8 bays (8 plugs)
GPS Coordinates43.35283, -4.04324
Official IDQKDKZPHT119CGBNBORV8
Official Registry DateFeb 18, 2026

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Torrelavega, belonging to the province of Cantabria (Cantabria, Spain). The charging equipment and commercial operation belong to the TotalEnergies Charging Services España, SLU network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
11 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
11 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A
3Charging Bay #3
1 connector available
Tipo 2 (Mennekes)
11 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A
4Charging Bay #4
1 connector available
Tipo 2 (Mennekes)
11 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A
5Charging Bay #5
1 connector available
Tipo 2 (Mennekes)
11 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:16 A
6Charging Bay #6
1 connector available
Tipo 2 (Mennekes)
11 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:16 A
7Charging Bay #7
1 connector available
Tipo 2 (Mennekes)
11 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:16 A
8Charging Bay #8
1 connector available
Tipo 2 (Mennekes)
11 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:16 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO CodeQKDKZPHT119CGBNBORV8
Post / EVSE Identifier #1GA76PUYKEIWEEUCJFBJW7H4LSIE
Post / EVSE Identifier #2ES*TCB*E000004
Post / EVSE Identifier #31
Post / EVSE Identifier #4XDSJ9QYWMMMJWUZCNWWLOL9RCH0
Post / EVSE Identifier #5ES*TCB*E000005
Post / EVSE Identifier #6OLKBYFBIO9MSATISKSESUY6OMS6
Post / EVSE Identifier #7ES*TCB*E000006
Post / EVSE Identifier #8MZB2DQKC2WSSPF91EXXOOFSDAFL
Post / EVSE Identifier #9ES*TCB*E000007
Post / EVSE Identifier #10VUIE0Y8I4VZNX5TZYL6OWPPETVD
Post / EVSE Identifier #11ES*TCB*E000187
Post / EVSE Identifier #12E6H0OKBOP8J8NHT3NEUXBENAWPB
Post / EVSE Identifier #13ES*TCB*E000188
Post / EVSE Identifier #148EOWMMCT1SEAITOLPGM9PDTCPTO
Post / EVSE Identifier #15ES*TCB*E000189
Post / EVSE Identifier #16D5HBB1L22CO58X1DSEGPREFPDCZ
Post / EVSE Identifier #17ES*TCB*E000190

Theoretical Charging Times at Maximum Power (11 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~1 h 49 min(~1.8 hours)
40 kWh Battery~3 h 38 min(~3.6 hours)
60 kWh Battery~5 h 27 min(~5.5 hours)
80 kWh Battery~7 h 16 min(~7.3 hours)

Opening Hours

Public hours not specified

Supported Payment Methods

💳RFID Card / Keyfob reader
📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 43.35283 | Lon: -4.043241View on OpenStreetMap →

Other Nearby Charging Stations

120 kW(Fast)🏬Centro Comercial
1.8 km away

Parque Comercial Ganzo

Bo. Ganzo, 58, 39300 Torrelavega, Cantabria
Operator:Punto Recargas SL
CCS Combo 2CHAdeMO
6 points • 6 plugs
Details
60 kW(Fast)
2.8 km away

US_222_Cartes

Poblado Santiago De Cartes
Operator:PLENOIL, S.L.
Tipo 2 (Mennekes)
1 point • 1 plug
Details
150 kW(Ultra-fast)
4.2 km away

Reocín, Spain

Autovía Del Cantábrico, Km 234
Operator:Tesla Spain SLU
CCS Combo 2Tipo 2 (Mennekes)
8 points • 16 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.