3.6 kW• Standard🅿️Parking24/7Active in MITECO registry

Parking Edificio Los Cubos Sotano -2 Zona Sur

C. De Albacete, 5, Cdad. Lineal, 28027 Madrid, Madrid (28027), Madrid, Spain
Network OperatorERANOVUM E-MOBILITY, S.L.
Total Capacity3 bays (3 plugs)
GPS Coordinates40.44269, -3.65784
Official ID2024007310
Official Registry DateDec 02, 2024

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Madrid, belonging to the province of Madrid (Madrid, Comunidad de, Spain). The charging equipment and commercial operation belong to the ERANOVUM E-MOBILITY, S.L. network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
3.6 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
3.6 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
3Charging Bay #3
1 connector available
Tipo 2 (Mennekes)
3.6 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2024007310
Post / EVSE Identifier #1COD20240000047172PR00018965
Post / EVSE Identifier #2ES*ERA*E25378
Post / EVSE Identifier #31
Post / EVSE Identifier #4COD20240000047173PR00018966
Post / EVSE Identifier #5ES*ERA*E25379
Post / EVSE Identifier #6COD20240000047174PR00018967
Post / EVSE Identifier #7ES*ERA*E25380

Theoretical Charging Times at Maximum Power (3.6 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~5 h 33 min(~5.6 hours)
40 kWh Battery~11 h 7 min(~11.1 hours)
60 kWh Battery~16 h 40 min(~16.7 hours)
80 kWh Battery~22 h 13 min(~22.2 hours)

Opening Hours

Miercoles (00:00 - 23:59) Lunes (00:00 - 23:59) Martes (00:00 - 23:59) Jueves (00:00 - 23:59) Sabado (00:00 - 23:59) Domingo (00:00 - 23:59) Viernes (00:00 - 23:59)

Supported Payment Methods

📱Mobile App (Remote activation & eMSP roaming)
💳RFID Card / Keyfob reader

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 40.44269 | Lon: -3.65784View on OpenStreetMap →

Other Nearby Charging Stations

7 kW(Standard)
7.6 km away

M-ALCOBENDAS-009

Encinar De Los Reyes,2
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
6 points • 6 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.