7.36 kW• Standard🅿️Parking24/7Active in MITECO registry

Parking Condal

C/ De Provença, 219, Barcelona (08008), Barcelona, Spain
Network OperatorElectrica Sollerense SA
Total Capacity5 bays (10 plugs)
GPS Coordinates41.39291, 2.15880
Official ID2024007456
Official Registry DateDec 05, 2024

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Barcelona, belonging to the province of Barcelona (Cataluña, Spain). The charging equipment and commercial operation belong to the Electrica Sollerense SA network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
2 connectors available
Tipo 2 (Mennekes)
7.36 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Tipo 2 (Mennekes)
7.36 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
2Charging Bay #2
2 connectors available
Tipo 2 (Mennekes)
7.36 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Tipo 2 (Mennekes)
7.36 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
3Charging Bay #3
2 connectors available
Tipo 2 (Mennekes)
7.36 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Tipo 2 (Mennekes)
7.36 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
4Charging Bay #4
2 connectors available
Schuko (Enchufe doméstico)
7.36 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Schuko (Enchufe doméstico)
7.36 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
5Charging Bay #5
2 connectors available
Schuko (Enchufe doméstico)
7.36 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Schuko (Enchufe doméstico)
7.36 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2024007456
Post / EVSE Identifier #1COD20240000047484PR00019277
Post / EVSE Identifier #2ES*SOL*E4600
Post / EVSE Identifier #31
Post / EVSE Identifier #42
Post / EVSE Identifier #5COD20240000047485PR00019278
Post / EVSE Identifier #6ES*SOL*E4601
Post / EVSE Identifier #7COD20240000047486PR00019279
Post / EVSE Identifier #8ES*SOL*E4602
Post / EVSE Identifier #9COD20240000047487PR00019280
Post / EVSE Identifier #10ES*SOL*E5346
Post / EVSE Identifier #11COD20240000047488PR00019281
Post / EVSE Identifier #12ES*SOL*E5347

Theoretical Charging Times at Maximum Power (7.36 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~2 h 43 min(~2.7 hours)
40 kWh Battery~5 h 26 min(~5.4 hours)
60 kWh Battery~8 h 9 min(~8.2 hours)
80 kWh Battery~10 h 52 min(~10.9 hours)

Opening Hours

Miercoles (00:00 - 23:59) Domingo (00:00 - 23:59) Martes (00:00 - 23:59) Lunes (00:00 - 23:59) Sabado (00:00 - 23:59) Jueves (00:00 - 23:59) Viernes (00:00 - 23:59)

Supported Payment Methods

📱Mobile App (Remote activation & eMSP roaming)
💳RFID Card / Keyfob reader

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 41.39291 | Lon: 2.158799View on OpenStreetMap →

Other Nearby Charging Stations

7.4 kW(Semi-fast)
3.2 km away

APK2 Plaza del Mar

Passeig De Joan De Borbón 78
Operator:EDP CLIENTES SAU
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.