7.4 kW• Semi-fast🅿️Parking24/7Active in MITECO registry

Parking Asturias

Calle Foncalada 14, Oviedo (33002), Asturias, Spain
Network OperatorEDP CLIENTES SAU
Total Capacity3 bays (3 plugs)
GPS Coordinates43.36481, -5.84648
Official ID2023002244
Official Registry DateAug 31, 2023

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Oviedo, belonging to the province of Asturias (Asturias, Principado de, Spain). The charging equipment and commercial operation belong to the EDP CLIENTES SAU network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
7.4 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
7.4 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A
3Charging Bay #3
1 connector available
Tipo 2 (Mennekes)
7.4 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2023002244
Post / EVSE Identifier #1COD20230000011500PR00000516
Post / EVSE Identifier #2ES*EDP*E00323
Post / EVSE Identifier #31
Post / EVSE Identifier #4COD20230000011501PR00000517
Post / EVSE Identifier #5ES*EDP*E00324
Post / EVSE Identifier #6COD20230000011502PR00000518
Post / EVSE Identifier #7ES*EDP*E00325

Theoretical Charging Times at Maximum Power (7.4 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~2 h 42 min(~2.7 hours)
40 kWh Battery~5 h 24 min(~5.4 hours)
60 kWh Battery~8 h 6 min(~8.1 hours)
80 kWh Battery~10 h 49 min(~10.8 hours)

Opening Hours

24/7

Supported Payment Methods

📱Mobile App (Remote activation & eMSP roaming)
💳RFID Card / Keyfob reader

Accessibility & Amenities

Accessibility: SI.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 43.36481 | Lon: -5.846477View on OpenStreetMap →

Other Nearby Charging Stations

22 kW(Semi-fast)
570 m away

O-OVIEDO-041

Palmira Villa,1
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
22 kW(Semi-fast)
800 m away

O-OVIEDO-023

Santa Teresa,9
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
22 kW(Semi-fast)
830 m away

O-OVIEDO-032

De Torrelavega,27
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.