100 kW• Fast24/7Active in MITECO registry

Parada de Autobús. Jimenado

Calle Ruiseñor, 2-24, Cartagena (30708), Murcia, Spain
Network OperatorWENEA EMOBILITY SERVICES S.L.
Total Capacity6 bays (6 plugs)
GPS Coordinates37.76248, -1.03700
Official ID2024004246
Official Registry DateJun 12, 2024

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Cartagena, belonging to the province of Murcia (Murcia, Región de, Spain). The charging equipment and commercial operation belong to the WENEA EMOBILITY SERVICES S.L. network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
7.4 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:230 V
Amperage:11 A
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
7.4 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:230 V
Amperage:11 A
3Charging Bay #3
1 connector available
CCS Combo 2
100 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:250 A
4Charging Bay #4
1 connector available
CHAdeMO
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:125 A
5Charging Bay #5
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:230 V
Amperage:32 A
6Charging Bay #6
1 connector available
CCS Combo 2
100 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:250 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2024004246
Post / EVSE Identifier #1COD20240000034888PR00011080
Post / EVSE Identifier #2ES*WEN*EJIMENADO22
Post / EVSE Identifier #3385e4a61-08cb-c0c8-783b-175f45a37413
Post / EVSE Identifier #4COD20240000034889PR00011081
Post / EVSE Identifier #5ES*WEN*EJIMENADO21
Post / EVSE Identifier #6332314bd-537d-cb1f-2ed8-98f8f99304be
Post / EVSE Identifier #7COD20240000034890PR00011082
Post / EVSE Identifier #8ES*WEN*EJIMENADO14
Post / EVSE Identifier #9b8a884db-bf0f-e19f-c64e-ae7c29cc4567
Post / EVSE Identifier #10COD20240000034891PR00011083
Post / EVSE Identifier #11ES*WEN*EJIMENADO13
Post / EVSE Identifier #1225d6ab94-2c75-9e3c-e32c-0bdce162b068
Post / EVSE Identifier #13COD20240000034892PR00011084
Post / EVSE Identifier #14ES*WEN*EJIMENADO12
Post / EVSE Identifier #156daa1950-96e3-1ffc-7211-850014dce107
Post / EVSE Identifier #16COD20240000034893PR00011085
Post / EVSE Identifier #17ES*WEN*EJIMENADO11
Post / EVSE Identifier #1879bc1933-a139-5209-540e-91e7a7c55465

Theoretical Charging Times at Maximum Power (100 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~12 min(~0.2 hours)
40 kWh Battery~24 min(~0.4 hours)
60 kWh Battery~36 min(~0.6 hours)
80 kWh Battery~48 min(~0.8 hours)

Opening Hours

Miercoles (00:00 - 23:59) Lunes (00:00 - 23:59) Sabado (00:00 - 23:59) Martes (00:00 - 23:59) Jueves (00:00 - 23:59) Viernes (00:00 - 23:59) Domingo (00:00 - 23:59)

Supported Payment Methods

📱Mobile App (Remote activation & eMSP roaming)
💳RFID Card / Keyfob reader

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 37.762485 | Lon: -1.037005View on OpenStreetMap →

Other Nearby Charging Stations

22 kW(Semi-fast)
5.0 km away

MU-Cartagena-026

Constitucion Española,38
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.