7.36 kW• Standard24/7Active in MITECO registry

ONCE DT Extremadura

C/ Manuel Fernández Mejías, 5, Badajoz (06002), Badajoz, Spain
Network OperatorREPSOL SOLUCIONES ENERGÉTICAS SA
Total Capacity4 bays (4 plugs)
GPS Coordinates38.87560, -6.97120
Official IDZESEYOIC5MSKK72SKUKV
Official Registry DateJun 01, 2026

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Badajoz, belonging to the province of Badajoz (Extremadura, Spain). The charging equipment and commercial operation belong to the REPSOL SOLUCIONES ENERGÉTICAS SA network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
7.36 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
7.36 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
3Charging Bay #3
1 connector available
Tipo 2 (Mennekes)
7.36 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
4Charging Bay #4
1 connector available
Tipo 2 (Mennekes)
7.36 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO CodeZESEYOIC5MSKK72SKUKV
Post / EVSE Identifier #1JVTZBP4VSRUREDSEEJMPJMQRSJB
Post / EVSE Identifier #2ES*REP*E17917*1
Post / EVSE Identifier #31
Post / EVSE Identifier #4XDOBF4UMJJRKLMUKKQCGJDSVQGC
Post / EVSE Identifier #5ES*REP*E17921*1
Post / EVSE Identifier #63VK6FWUBZDAE27MOBPPJMJYTPPU
Post / EVSE Identifier #7ES*REP*E17922*1
Post / EVSE Identifier #84CXVFN9X18BCHD9WOREECADON1N
Post / EVSE Identifier #9ES*REP*E17923*1

Theoretical Charging Times at Maximum Power (7.36 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~2 h 43 min(~2.7 hours)
40 kWh Battery~5 h 26 min(~5.4 hours)
60 kWh Battery~8 h 9 min(~8.2 hours)
80 kWh Battery~10 h 52 min(~10.9 hours)

Opening Hours

24/7

Supported Payment Methods

📱Mobile App (Remote activation & eMSP roaming)
💳RFID Card / Keyfob reader

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 38.875598 | Lon: -6.9712View on OpenStreetMap →

Other Nearby Charging Stations

22 kW(Semi-fast)
130 m away

Telpark - San Atón

Martín Cansado, 2
Operator:MAKSU ESPAÑA SL
Tipo 2 (Mennekes)
6 points • 6 plugs
Details
22 kW(Semi-fast)🅿️Parking
520 m away

62020013930022

Parking Plaza Conquistadores - Calle General
Operator:ENDESA X WAY, S.L.
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
22 kW(Semi-fast)🅿️Parking
530 m away

62020013930039

Parking Plaza Conquistadores - C. Gral.
Operator:ENDESA X WAY, S.L.
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.