7.4 kW• Semi-fast24/7Active in MITECO registry

NH Collection Barcelona Constanza

C. Deu I Mata, 69-99, Barcelona (08029), Barcelona, Spain
Network OperatorWenea Services Spain, S.L.
Total Capacity3 bays (3 plugs)
GPS Coordinates41.38876, 2.13625
Official ID2024004297
Official Registry DateAug 12, 2026

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Barcelona, belonging to the province of Barcelona (Cataluña, Spain). The charging equipment and commercial operation belong to the Wenea Services Spain, S.L. network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
7.4 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:230 V
Amperage:32 A
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
7.4 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:230 V
Amperage:32 A
3Charging Bay #3
1 connector available
Tipo 2 (Mennekes)
7.4 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:230 V
Amperage:32 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2024004297
Post / EVSE Identifier #1COD20240000035116PR00011308
Post / EVSE Identifier #2ES*WEN*ENHCONSTANZA31
Post / EVSE Identifier #326be958c-7690-afbb-0c1c-5e7fadd48ab7
Post / EVSE Identifier #4COD20240000035117PR00011309
Post / EVSE Identifier #5ES*WEN*ENHCONSTANZA21
Post / EVSE Identifier #62bd93feb-9f96-f3e1-b209-120d14c973d1
Post / EVSE Identifier #7COD20240000035118PR00011310
Post / EVSE Identifier #8ES*WEN*ENHCONSTANZA11
Post / EVSE Identifier #94f33a115-5630-cb36-bfab-1ecb658ac9f5

Theoretical Charging Times at Maximum Power (7.4 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~2 h 42 min(~2.7 hours)
40 kWh Battery~5 h 24 min(~5.4 hours)
60 kWh Battery~8 h 6 min(~8.1 hours)
80 kWh Battery~10 h 49 min(~10.8 hours)

Opening Hours

24/7

Supported Payment Methods

💳RFID Card / Keyfob reader
📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 41.388759 | Lon: 2.136247View on OpenStreetMap →

Other Nearby Charging Stations

7.4 kW(Semi-fast)
2.2 km away

APK2 Centric BCN

Aragó 252
Operator:EDP CLIENTES SAU
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.