7 kW• Standard24/7Active in MITECO registry

NA-MurilloElCuende-001

Esparza Bidea,0, Murillo el Cuende (31383), Navarra, Spain
Network OperatorIBERDROLA CLIENTES S.A.U
Total Capacity4 bays (4 plugs)
GPS Coordinates42.32068, -1.57412
Official ID2024000022
Official Registry DateJan 31, 2024

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Murillo el Cuende, belonging to the province of Navarra (Navarra, Comunidad Foral de, Spain). The charging equipment and commercial operation belong to the IBERDROLA CLIENTES S.A.U network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
7 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:230 V
Amperage:32 A
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
7 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:230 V
Amperage:32 A
3Charging Bay #3
1 connector available
Tipo 2 (Mennekes)
7 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:230 V
Amperage:32 A
4Charging Bay #4
1 connector available
Tipo 2 (Mennekes)
7 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:230 V
Amperage:32 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2024000022
Post / EVSE Identifier #1COD20240000020064PR00000067
Post / EVSE Identifier #2ES*IBD*E158507
Post / EVSE Identifier #3168342
Post / EVSE Identifier #4COD20240000020065PR00000068
Post / EVSE Identifier #5ES*IBD*E158508
Post / EVSE Identifier #6168343
Post / EVSE Identifier #7COD20240000020066PR00000069
Post / EVSE Identifier #8ES*IBD*E158509
Post / EVSE Identifier #9168344
Post / EVSE Identifier #10COD20240000020067PR00000070
Post / EVSE Identifier #11ES*IBD*E158510
Post / EVSE Identifier #12168345

Theoretical Charging Times at Maximum Power (7 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~2 h 51 min(~2.9 hours)
40 kWh Battery~5 h 43 min(~5.7 hours)
60 kWh Battery~8 h 34 min(~8.6 hours)
80 kWh Battery~11 h 26 min(~11.4 hours)

Opening Hours

Miercoles (00:00 - 23:59) Martes (00:00 - 23:59) Lunes (00:00 - 23:59) Jueves (00:00 - 23:59) Sabado (00:00 - 23:59) Viernes (00:00 - 23:59) Domingo (00:00 - 23:59)

Supported Payment Methods

💳RFID Card / Keyfob reader
📅Advance slot reservation supported
📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 42.320679 | Lon: -1.574121View on OpenStreetMap →

Other Nearby Charging Stations

50 kW(Fast)
13.8 km away

MARCILLA

C. Progreso, 8,
Operator:Energía Distribuida del Norte S.A.
Tipo 2 (Mennekes)CCS Combo 2
1 point • 2 plugs
Details
50 kW(Fast)
15.0 km away

Camping Bárdenas

Ctra. Na-660, Pk 13.4
Operator:WENEA EMOBILITY SERVICES S.L.
CCS Combo 2CHAdeMOTipo 2 (Mennekes)
6 points • 6 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.